Browse
Search
Agenda - 04-19-2011 - Information Item 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 04-19-2011
>
Agenda - 04-19-2011 - Information Item 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2011 11:56:09 AM
Creation date
4/15/2011 11:56:08 AM
Metadata
Fields
Template:
BOCC
Date
4/19/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
Information Item 3
Document Relationships
Minutes 04-19-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Orange County Health and Dental Clinic Renovation <br />Contractor: H.M. Kern Corporation, Charlotte North Carolina <br />Designer: Corley, Redfoot, Zack Architects, Chapel Hill North Carolina <br />Location: 300 West Tryon Street <br />Budget: $1,470,000.00 <br />Description: <br />Renovation of the ground floor of Building A (former administrative offices) <br />for the consolidated health clinic and. the upfit of Building B (current dental <br />clinic) for expansion of consolidated services at the location. The project <br />also includes structurally reinforcing the 1St and 2"d floor of building A as <br />well as the installation of a whole building sprinkler system in Building A. <br />Status: <br />The project is 20% complete and on schedule. The project is being <br />completed in two phases: Building A and then Building B. Demolition is <br />complete in Building A; ongoing "rough-in" installation of mechanical, <br />electrical and plumbing rough-in continues. Building A is scheduled to be <br />complete in late May, 2011, followed by the health department <br />consolidation within Building A and the beginning of the Building B phase. <br />Building B is scheduled to be complete in late July, 2011 and will be <br />occupied by the consolidated dental operations moving in from the <br />Carrboro location. <br />
The URL can be used to link to this page
Your browser does not support the video tag.