Browse
Search
Agenda - 04-19-2011 - 8c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 04-19-2011
>
Agenda - 04-19-2011 - 8c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2011 11:36:30 AM
Creation date
4/15/2011 11:36:29 AM
Metadata
Fields
Template:
BOCC
Date
4/19/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8c
Document Relationships
Minutes 04-19-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: April 19, 2011 <br />Action Agenda <br />Item No. ~ r G <br />SUBJECT: Buckhorn-Mebane Economic Development Area Water and Sewer Design <br />DEPARTMENT: Planning <br />ATTACHMENT(S): <br />1. Buckhorn-Mebane EDD Concept <br />Sewer Layout -Phase 2 <br />2. Buckhorn-Mebane Area Map with <br />Acreages <br />PUBLIC HEARING: (Y/N) 0 <br />INFORMATION CONTACT: <br />Craig Benedict, Planning Director, 245- <br />2592 <br />Kevin Lindley, Staff Engineer, 245-2583 <br />PURPOSE: To consider an optional design alignment and sewer facility for Phase 2 of the <br />Buckhorn-Mebane Economic Development Area (EDD) water and sewer infrastructure. <br />BACKGROUND: The Board of County Commissioners (BOCC) approved a contract with <br />Hobbs Upchurch Associates (HUA) in November 2010 for the design of water and sewer <br />infrastructure to serve a portion of the Buckhorn-Mebane EDD known as Area "D1" (shown on <br />Attachment 1). This portion of the EDD is generally described as being bounded by Gravelly <br />Hill Middle School to the east, Buckhorn Road to the west, West Ten Road to the south and <br />Interstate 85/40 to the north. The portion of the infrastructure being designed has been <br />generally referred to as Phase 2 and is part of a multi-phase approach to design and build water <br />and sewer infrastructure to eventually serve the entire Buckhorn-Mebane EDD. Phase 1 water <br />and sewer infrastructure, which has already been installed and is currently in operation, serves <br />Gravelly Hill Middle School and several houses along Buckhorn Road and West Ten Road. <br />Design Options <br />After an initial review of the topography in the area and the draft phasing plan provided by the <br />County, HUA proposed two design scenarios to County staff. Option 1 is to pump the sewer <br />flow from Area D1 of the EDD via a force main along West Ten and Bowman Roads all the way <br />to Mebane's Southeast Regional Pump Station. This design option was the basis of HUA's <br />design contract price of $192,000 which the BOCC approved in November 2010. Option 1 also <br />added a backbone gravity sewer line westerly from Gravelly Hill Middle School towards <br />Buckhorn Road in a 400+/- acre area. Option 2 is to pump via force main along West Ten <br />Road to the intersection of West Ten Road and Bowman Road, at which point a gravity line <br />could be constructed to flow cross-country north of Bowman Road to the Southeast Regional <br />Pump Station. These two design alternatives are shown on Attachment 1 and labeled as <br />"Phase 2B-Option 1" and "Phase 2B-Option 2". <br />
The URL can be used to link to this page
Your browser does not support the video tag.