Orange County NC Website
information which could affect the work. <br />The Engineering Consultant will not be responsible for or have control or charge of construction means, <br />methods, techniques, sequences, or procedures or for safety precautions and programs in connection with the <br />work, and will not be responsible for the contractors failure to cant' out the work in accordance with the <br />contract documents. The Engineering Consultant will not be responsible for or have control or charge over the <br />acts or omissions of the contractor, subcontractors or any other agents or employees or any other persons <br />performing any of the work. It will be the responsibility of the contractor to verify the depth and location of all <br />underground utilities prior to starting construction. Should any underground utility not be located as shown on <br />the drawings, the contractor will notify the Engineering Consultant immediately before starting any <br />construction for a resolution of the discrepancy. The Engineering Consultant will be saved harmless from any <br />damaged utility during construction with the cost for repairing any underground utility borne by the contractor. <br />1V. COMPENSATION <br />Compensation for work as outlined by the BASIC SCOPE OF SERVICES and PROJECT DESCRIPTION <br />of this Agreement will be provided hourly at the rates outlined in Item V applied against the "Not-To-Exceed <br />Cost" of $484,390.00 listed below. Reimbursable expenses and costs and additional engineering services will <br />be paid as outlined in Section lI G of this Agreement. The "Not-To-Exceed Cost" of $484,390.00 for this <br />Project will be according to the following schedule: <br />Item I BUCKHORN ECONOMIC DISTRICT (PLANS AND SPECIFICATIONS) <br />Core ---------------------------------------------------------------------------- $ 108,044.00 <br />Optimum --------------------------------------------------------------------------- $ 17,131.00 <br />Item II CENTRAL EFLAND AREA (PLANS AND SPECIFICATIONS) <br />Core ------------------------------------------------------------------------- $ 136,586.00 <br />Optimum ------------------------------------------------------------------------- $ 37 239.00 <br />Item III OTHER ENGINEERING SERVICES <br />• Buckhom Economic District Utility Study ----------------------------- $ 18,000.00 <br />• Environmental Assessment (For Grant) ---------------------------------- $ 25,000.00 <br />• Preliminary Engineering Report ------------------------------------------- $ 22,500.00 <br />• Surveying Easements Plats --------------------------------------------- $ 20,000.00 <br />• Construction Phase Services -------------------------------- $ 99,g90,(~ <br />TOTAL KNOT-TO-EXCEED ENGINEERING COST" $ 484,390.00 Plus <br />Reimbursable <br />Expenses and Costs <br />V. HOURLY RATES <br />Licensed Professional Engineer -------------------------------------------------------____-- $ 110.00/HR <br />Environmental Consultant ----------------------------------------------------------------____-- $ 120.00/HR <br />Licensed Professional Land Surveyor------------------------------------------------____-- $ 95.00/HIt <br />Engineer-in-Training (E.L)------------------------------------------------------------------- $ 85.00/HR <br />2 Man Survey Crew -------------------------------------------------------------------------- $ 105.00/HR <br />3 Man Survey Crew --------------------------------------------------------------------------- $ 125.00/HR <br />CAD Operator/Drafter -------------------------------------------------------------------- $ 65.00/HR <br />