Browse
Search
2004 S Manager - Coulter, Jewell and Thames for Consulting Engineering Services Efland Sewer Buckhorn EDD
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2004
>
2004 S Manager - Coulter, Jewell and Thames for Consulting Engineering Services Efland Sewer Buckhorn EDD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 3:17:52 PM
Creation date
4/12/2011 3:17:50 PM
Metadata
Fields
Template:
BOCC
Date
12/14/2004
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5k
Document Relationships
Agenda - 12-14-2004-5k
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2004\Agenda - 12-14-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Site Plan lay-out, grading, storm drainage etc... with sufficient details for review and approval <br />by Orange County Planning Department <br />• Power supply <br />• Instrumentation <br />• Emergency power (generator sizing) <br />• Telemetry <br />• Delineation of wet-lands and 100-yeaz flood elevation <br />• Outside lighting <br />• Planting <br />• Easement or properly plats as necessary for selected sites for pump stations <br />• Other components as deemed necessary or required by regulatory agencies and from local <br />governing bodies who have jurisdiction over this Project. <br />3. Prepare detailed technical specifications, permit applications and encroachment agreements. <br />4. Prepare detailed contract documents for bidding and negotiating with multiple utility contractors in <br />accordance with applicable state laws that govern the selection of Contractor(s) for public contracts. <br />5. Prepare plats for obtaining easements, Right-of--Ways or properties for the construction of utilities <br />outlined in the PROJECT DESCRIPTION of this Agreement. <br />C. PERMITTING PHASE: <br />1. Obtain Erosion Control Permits for land distributing operations from the State and or local <br />regulatory agency with the County. <br />2. Obtain Highway Encroachment Agreements from N.C.D.O.T. <br />3. Obtain water main extension permits, sanitary sewer extension permits and pump station /force <br />main permits from NCDENR. <br />4. Obtain other permits as applicable for the Project, including wetland and stream crossing permits <br />from the Army Corp of Engineers and or NCDWQ. <br />5. Site Plan Approval for Pump Station Sites through Orange County Planning Department. <br />D. BIDDING AND NEGOTIATING PHASE: <br />1. Distribute plans and specifications to prospective bidders for pricing, following all applicable state <br />laws that govern the formal bid process for construction contracts involved with public monies. <br />2. Conduct aPre-Bid Conference at a time and place selected by the Owner. <br />3. Prepare Bid Tabulations and Certification of Bid results for Owner. <br />4. Recommendation of Awazd of low, responsible, responsive bidder to the Owner. <br />5. Assist Owner with preparing a Contract with selected utility contractor. <br />E. CONSTRUCTION OBSERVATION / AS-BUILT DRAWING PHASE <br />1. Conduct aPre-Construction Conference with the selected contractor at a time and place selected by <br />the Owner. <br />2. Make site visits, attend project meetings, provide clarification of drawings while construction is in <br />progress, assist the Contractor in interpreting the contract documents and observe that the <br />
The URL can be used to link to this page
Your browser does not support the video tag.