Orange County NC Website
lI. SCOPE OF BASIC SERVICES: <br />A. PLANNING PHASE: <br />1. Prepare an Environmental Assessment for the entire Project and submit to NCDENR for review <br />and approval. Preparation of the Environmental Assessment will be in accordance with USEPA <br />grant funding guidelines as administered by the State's Construction Grant and Loan Section. <br />2. Prepare a Preliminary Engineering Report for the entire Project in accordance with USEPA grant <br />funding guidelines as administered by the State's Construction Grant and Loan Section. <br />3. Develop a "Utility Plan" that shows the location and size of future public utilities (water and <br />sanitary sewers) that will serve the Buckhorn Economic Development District. This "Utility Plan" <br />will include base mapping that shows the location and size of proposed utilities while complying <br />with local planning ordinances and State regulatory laws. In addition to the base mapping, a <br />written report to Orange County will be provided that describes the investigative findings for <br />future extension of public utilities inside the Buckhorn Economic Development District. <br />4. Develop a "Pumping Plan" for the pump station what will serve the Buckhorn Economic <br />Development District and the pump station(s) that will serve Central Efland. This "Pumping Plan" <br />will include but not be limited to the following: <br />• Land use and potential development of properties tributary to each pump station in accordance <br />with local zoning and planning maps <br />• Daily average and peak sanitary sewer flows draining to each pump station in accordance with <br />NCDENR Guidelines <br />• Location of pump station sites based upon preliminary field surveys <br />• Size and type of all pump stations <br />• Preliminary pumping rates and points of discharge <br />• Determine force main sizing for each pump station and determine the size of receiving gravity <br />sanitary sewers that the force mains will discharge into upstream from each pump station <br />Note: Pump station design for the Buckhom Economic Development District Area will be <br />coordinated with the City of Mebane. Pump station design(s) for Central Efland will be <br />coordinated with Orange County. <br />5. Perform fire flows and hydraulic analysis to evaluate the existing water distribution system that <br />will supply water to the Buckhorn Economic Development District. Determine the size of the <br />proposed waterline that will be extended along Buckhom Road and West Ten Road to serve the <br />proposed Middle School Site and portions of the Buckhorn Economic Development District. <br />6. Attend public meetings or other meetings related to the Project as required by Orange County. <br />B. DESIGN PHASE: <br />Prepare detailed plan/profile drawings of all water main extensions, sanitary sewer collection <br />piping /force main piping and miscellaneous details relative to the Project as outlined hereinbefore <br />in the PROJECT DESCRIPTION. <br />2. Design multiple pump stations (at least two (2) and not more than three (3)) in accordance with <br />design parameters established by PLANNING PHASE in Item II A4 of this Agreement and in <br />accordance with NCDENR Guidelines. The design of the pump stations will include but will not be <br />limited to the following: <br />• Pump selection and associated calculations for review by City of Mebane and Orange County <br />where appropriate <br />• Wet-well sizing <br />