Orange County NC Website
Construct a gravity sanitary sewer collection system adjacent to the northwest corner of the <br />Buckhorn Economic Development District. The purpose of this gravity sanitary sewer collection <br />system will be to serve existing lots in this area. The approximate length of this gravity sanitary <br />sewer collection system is 8,097 linear feet. The construction of this sanitary sewer collection <br />system will be in accordance with the City of Mebane's Utility Standards. The general concept and <br />location of this system is shown in red as a "Core" and green as an "Optimum" utility on the <br />attached map dated 12/1/2004. <br />4. Develop a "Utility Plan" that shows the future extension of public utilities (water and sanitary <br />sewers) that will serve the Buckhorn Economic Development District. The area of land that <br />comprises the Buckhorn Economic Development District is shown in light blue on the attached <br />map dated 12/1/2004. <br />5. Omitted From The Project In The Bnchhorn Road Economic Development District Area: <br />~ 12-inch waterline around the east and north boundaries of the Buckhorn Economic <br />Development District. This waterline is shown by a dashed blue line as an "Optimum" <br />utility on the attached map dated 12/1/2004. <br />~ $-inch waterline that would serve lots located off West Ten Road located in the southwest <br />corner of the Buckhorn Economic Development District. This waterline is shown by a <br />dashed blue line as an "Optimum" utility on the attached map dated 12/1/2004. <br />B. CENTRAL EFLAND: <br />1. Construct a gravity sanitary sewer collection system that will serve Central Efland. The purpose of <br />this gravity sanitary sewer collection system will be to serve existing lots in this area. The <br />approximate length of this gravity sanitary sewer collection system is 20,9901inear feet. The <br />construction of this sanitary sewer collection system will be in accordance with utility standards <br />outlined by Orange County. The general concept and location of this system is shown in purple as <br />a "Core" and yellow as an "Optimum" utility on the attached map dated 12/1/2004. <br />2. Construct a new pump station with force main piping as required to receive and discharge <br />wastewater flows from the additional service area created by the construction of the sanitary sewer <br />collection system outlined in Item I B 1. The size of this new pump station, its location and design <br />will be in accordance with utility standards and good engineering practices approved by Orange <br />County and the County Engineer. The general concept and location of the pump station, while <br />shown by a purple square as a "Core" utility downstream from the existing McGowan Pump <br />Station on the attached map dated 12/1/2004, may be located at a different site more beneficial to <br />Orange County based upon recommendations made by the Engineering Consultant. Orange <br />County will have final approval with regard to the location of this pump station. <br />Additional Pumping Requirements: <br />It is understood by Coulter Jewell Thames P.A. that a second pump station may be required to <br />serve the Central Efland Area for the gravity sanitary sewer collection system that will be <br />constructed as described under Item I B1. It is further understood that it is the desire of Orange <br />County to eliminate a second pump station if pumping of all wastewater for the Central Efland <br />Area can be handled by the new pump station described in Item I B2. Coulter Jewell Thames P.A. <br />will make investigations as necessary to determine the need, if any, for a second pump station. <br />Should a second pump station be required, the cost for the engineering of this pump station is <br />included in the fees provided by this Agreement. The general concept and location of this second <br />pump station is shown by a purple square as a "Core" utility on the attached map dated 12/1/2004. <br />