Orange County NC Website
Coulter ~ Jewell ~ ThamesoA <br />Ill WEST MAIN STREET <br />DURHAM, NORTH CAROLINA 27701 <br />p 919.682.0368 f919.688.6646 <br />Planning for the future. <br />LETTER OF AGREEMENT <br />Made this 23'~ day of August, 2005 <br />TO THE OWNER <br />Orange County <br />200 South Cameron Street <br />P.O. BOX 8181 <br />Hillsborough, North Cazolina 27278 <br />BY THE ENGINEERING CONSULTANT <br />Coulter Jewell Thames, PA <br />111 West Main Street <br />Durham, North Carolina 27701 <br />©A'F - ~a~ ~y ~~o~~ <br />oRrc I1vA,, slGi~'r~RES ~ K <br />cow ~ ~ ~~~__, <br />DIST: `UGC-' <br />For Engineering and Related Professional Services <br />for the extension of water and sanitary sewer utilities to serve Central Efland and the Buclchom Road Economic <br />Development District and Community in Orange County. Areas to receive utility extensions aze shown on the <br />attached map dated 12/1/2004. <br />I. PROJECT DESCRIPTION: <br />A. BUCKHORN ROAD ECONOMIC DEVELOPMENT DISTRICT AND COMMUNITY: <br />1. Extend a 12-inch waterline from the end of the City of Mebane's water distribution <br />system on Buclchorn Road to a proposed Middle School Site located on West Ten Road. The <br />approximate length of this proposed waterline extension is 8,8961ineaz feet. Construction of this <br />waterline will be in accordance with the City of Mebane's Utility Standazds. The general concept <br />and location of this waterline are shown in blue as a "Core" utility on the attached map <br />dated 12!1/2004. <br />2. Construct a 250 G.P.M. Pump Station and a 6-inch force main /gravity sanitary sewer collection <br />system to serve the proposed Middle School Site located on West Ten Road. The approximate <br />length of the 6-inch force main is 6,9501ineaz feet. The approximate length of the gravity sanitary <br />sewer collection system in 8001ineaz feet. Construction of this sanitary sewer utility system will <br />be in accordance with the City of Mebane's Utility Standazds. The general concept and location of <br />the pump station, 6-inch force main and gravity sanitary sewer collection system are shown in red <br />as a "Core" utility on the attached map dated 12/1/2004. The red square on the attached map <br />represents the general location of the proposed pump station. <br />E N G I N E E R I N G P L A N N I N G _ L A N D S C A P E A R C H I T E C T U R E <br />