Browse
Search
Agenda - 04-07-2011 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 04-07-2011
>
Agenda - 04-07-2011 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2017 1:50:31 PM
Creation date
4/5/2011 9:07:05 AM
Metadata
Fields
Template:
BOCC
Date
4/7/2011
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 04-07-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• . i <br /> i + War & Severer Utilities Capital Projects <br /> Fiscal Years 2011-16 <br /> Project Name Efland serer-Flow to # r of Mebane Project Status Recommended <br /> Functional Service Area Community and Environment Starting ]ate 71112011 <br /> Department Plan nin Completion Fete 1213112016 <br /> Current Year l Year 2 Year 3 Year 4 Year 5 Five Year 6 - <br /> Prior Year Fiscal Year Fiscal Year Fiscal Ye 'r Fiscal Year Fiscal Year Fiscal Year Year to <br /> Project Budget Funding 2010-11 20i 1-12 2012-1 2013-14 2014-1 2015-16 Total Year 1 <br /> Appropriation <br /> Professional Design Services 50,000 1601000 2101000 <br /> Lan 1Building 40w000 40,000 <br /> Const,rucgonlRepairsIRenovations 11400,000 1,400#000 <br /> EquipmentlFumishings <br /> Total Project Budget 50YO00 1602000 40 000 1 v400,000 - 7650YO00 <br /> General Fund Related PperaUng Casts " <br /> Personnel services <br /> Operations <br /> New Debt Service 120:000 120,000 600,000 <br /> Total Operating Costs 120,000 1207000 600Y 00 <br /> 'e enues unding Source <br /> Transfer from General Fund 50,000 1601000 40l O 1201000 370,000 600,000 <br /> Debt inancing 1,4001000 114001000 <br /> Total 50V000 160 5,000 409000 19400x000 1205,000' 1 y7701,000 600,000 <br /> PLOIect Description/Justification <br /> Currrentlya the wastewater collected by the Efland sewer system is pumped easterly 3 112 rnlles to the Town of H111sborough via a 10"force main. This project <br /> would construct infrastructure to send the wastewater collected by the ex fisting (circa 1988+) proposed 2011-2013 system and potential future Efland severer <br /> system westerly along West Ten load to the City of Mebane instead. This fits into a long range strategy to ultimately turn over operation of the Efla d sewer <br /> system to the City of Mebane pending an interlocal agreement. <br /> 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.