<br />1. <br /> <br /> <br />• <br /> <br />• <br /> <br />• I I <br />452,004 CY Remaining <br />70 Months ~ <br />January 2016 <br /> <br />Revise slopes from 4:1 to 3:1 <br />Less than 10% capacity <br />increase <br />Additional 191,591 CY or <br />126,450 tans <br />. A I 1 1 ~~ ~ I I f I 1 ~+ <br />Advanta es <br />• No public involvement process <br />• Extended site life <br />• Additional tipping fees x$50 x 126,450 extra tons <br />$6,322,500) compared to existing permitted capacity <br />• Easily constructed and maintained side slopes <br />• Does not exceed existing permitted height <br />• Consistent with existing slope constructian <br />No additional cell construction <br />takes <br />D1Sa Vall___ <br />• Does not maximize potential airspace <br />• Extended site life may have negative impact on <br />public perception <br />2. 530,000 CY Remaining Advantages, <br /> 82 Months • Extended site life <br /> January 2017 • Additional tipping fees x$50 x 177,930 extra tons = <br /> $8,896,500} compared to existing permitted capacity <br />• Revise slopes from 4:1 to 3;1 Easily constructed and maintained side slopes to <br />• Maximum landf 11 height achieve maximum airspace <br />• Additiona1269,591 CY or • Consistent with existing slope construction <br /> 177,930 tans • No additianal cell construction <br /> Disadyanta~e_s_ <br /> • Public involvement process <br /> • Construction permit application renewal ~5-yr permit} <br /> • Slightly increases overall landf ll height <br /> • Extended site life may have negative impact on <br /> public perception <br />3. 617,000 CY Remaining Advanta es <br /> 96 Months • Extended site life <br /> March 2018 Additional tipping fees x$50 x 235,350 extra tons = <br /> $11,767,503} compared to existing permitted <br />• Revise slopes from 4:1 to 3:1 capacity <br />• Maximum landf 11 height • Maximum airspace <br />• includes slope wedge Na additional cell construction <br />• Additiona1356,591 CY or Di~advan~a es <br /> 235,350 tons • Public involvement process <br /> • Construction permit application renewal ~5-yr permit} <br /> • Slightly increases overall landfill height <br /> • Considerable Jiff culty in constructing wedge <br /> airspace recovery over existing constructed side <br /> slopes <br /> • Extended site life may have negative impact on <br /> public perception <br />