Browse
Search
Agenda - 04-05-2011 - 5d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 04-05-2011
>
Agenda - 04-05-2011 - 5d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 4:32:02 PM
Creation date
4/1/2011 10:26:26 AM
Metadata
Fields
Template:
BOCC
Date
4/5/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5d
Document Relationships
2011-425 Solid Waste - UNC Chapel Hill Landfill Gas Project Pipeline Easement Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2011
Minutes 04-05-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br />S. In accordance with and subj ect to the LFG Agreement, Grantee shall be <br />responsible for repair of any damage to Grantor's Properties, real and personal, caused by the <br />construction, installation, operation and maintenance of the LFG Equipment and Ductbank <br />Equipment, or in the exercise of its right of ingress and egress. <br />6. The temporary construction easements described above shall expire upon <br />completion of the installation of the LFG Equipment and Ductbank Equipment. <br />7. Grantee acknowledges it takes all easements granted herein subject to Grantor's <br />Municipal Solid waste Landfill Facility Permit No. 68-0 1 (the "Permit") and all requirements, <br />terms, and conditions contained within the Permit. In accordance with and subject to the LFG <br />Agreement, Grantor shall take reasonable steps to ensure Grantor's responsibilities pursuant to <br />the Permit do not interfere with Grantee's use of the easement areas. In the event the <br />requirements, terms, or conditions of the Permit, or actions associated therewith, cause <br />unreasonable interference with Grantee's use of the easement areas, Grantor and Grantee shall be <br />responsible for mitigating any such unreasonable interference in accordance with the terms of the <br />LFG Agreement. <br />S. If Grantee abandons the use of the easement areas, the easement areas shall revert <br />back to Grantor. <br />9. That by acceptance of these easements, the Grantee binds itself and its successors <br />and assigns to the foregoing conditions. <br />To HAVE AND To HOLD the aforesaid rights, privileges and easements unto said <br />Grantee, its successors and assigns, for so long as Grantee maintains said LFG Equipment and <br />Ductbank Equipment and no longer. <br />9 <br />{00042175.DOCX 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.