Browse
Search
Agenda - 04-05-2011 - 5d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 04-05-2011
>
Agenda - 04-05-2011 - 5d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 4:32:02 PM
Creation date
4/1/2011 10:26:26 AM
Metadata
Fields
Template:
BOCC
Date
4/5/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5d
Document Relationships
2011-425 Solid Waste - UNC Chapel Hill Landfill Gas Project Pipeline Easement Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2011
Minutes 04-05-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />County, Deed Boob 1 009, Page 437, N 81 °17'01" W, a distance of 23.19 feet to a point; <br />thence N 56'04'53"-W, a distance of 31.16 feet to a point in the southern right-of-way of <br />Homestead Road; thence along the southern right -of -way of Homestead Road S <br />79052'48" E, a distance of 49.28 feet to the point and place of beginning containing 450 <br />square feet or 0.010 acre, more or less. <br />IT IS UNDERSTOOD AND AGREED BETWEEN GRANTOR AND GRANTEE: <br />1. Grantee, through the University and the University's employees, contractors and <br />agents, shall have the right to go in and upon Grantor's Properties to construct, install, <br />reconstruct, work upon, repair, alter, inspect, and in general do any other thing necessary to <br />construct, install, maintain and operate said LFG Equipment and Ductbank Equipment for the <br />purposes aforesaid. <br />2. Nothing in this Agreement is to be construed to diminish Grantee's existing <br />license rights relating to the Landfill Property set forth in the LFG Agreement. The parties agree <br />that all terms and conditions in the LFG Agreement remain in full force and effect. <br />3. For the purpose of construction, installation, operation and maintenance of the <br />LFG- Equipment and Ductbank Equipment, Grantee shall have the right of ingress to and egress <br />from the easement areas over the lands of Grantor adjacent to the easement areas and lying <br />between public or private roads and the easement areas in such manner as shall occasion the least <br />practicable damage and inconvenience to Grantor. <br />4. Grantee shall restore the easement areas after installation of the LFG Equipment <br />and Ductbank Equipment to approximately the same condition as before said installation, <br />ordinary wear and tear excepted; provided that Grantee shall not be required to replant trees or <br />shrubs removed during the construction of the LFG- Equipment and Ductbank Equipment. <br />8 <br />100042175.Docx 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.