Browse
Search
2004 NS Housing- Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2004
>
2004 NS Housing- Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:41:47 AM
Creation date
3/31/2011 8:39:49 AM
Metadata
Fields
Template:
BOCC
Date
11/16/2004
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5l
Document Relationships
Agenda - 11-16-2004-5l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2004\Agenda - 11-16-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: James Grady <br />Address: 205 Rencher St. <br />City: Hillsborough, N.C. 27278 <br />Phone Number: 245-1298 <br />Date: July 1, 2004 <br />LIVING ROOM: <br />Install a new combination exterior door unit & storm door. <br />The door unit shall be of matching size. The new door shall have <br />a diamond or rectangle glass. Install a entry lockset & deadbolt <br />keyed alike. Install new matching casing on the interior. Prime <br />the trim with an oil primer. Paint the casing with semi-gloss <br />latex paint. All paint shall cover completely. <br />2. Secure the fireplace pit with galvanized metal. The fireplace shall <br />be made inoperable.( Fireplace vent was removed) <br />3. Install new carpet & pad in the Living room and short hallway. <br />The carpet to cost not less than $ 14 sq yd. <br />4. Insta113 %a" molded baseboard & 3" crown molding in the living <br />room & hallway. Prime & paint the baseboard, crown molding & <br />casing with semi-gloss latex paint. Paint the walls with flat latex <br />paint. All paint shall cover completely. <br />5. Install paneling strips over the joints in the ceiling. The color <br />shall match the existing ceiling trim. <br />KITCHEN/DINING ROOM: <br />Remove all base cabinets & counter top. Install new base cabinets <br />& molded countertop. Insta117ft of factory built matching cabinets. <br />Homeowner shall choose the countertop color. Secure the new <br />cabinets to the wall studs. Install new cabinet hardware. <br />2. Prepare the walls and all trim for paint. Remove all dirt & grease. <br />Remove all loose wall covering. Apply sheetrock filler to all <br />damaged areas, holes & cracks. Sand the sheetrock filler smooth. <br />Apply a bonding oil primer to the walls & trim. Paint the walls & <br />Trim with semi-gloss latex paint. The paint shall cover completely. <br />3. Install missing corner trim on all inside & outside corners. <br />Match the trim as close as possible. Prime & paint the corner trim <br />with semi-gloss latex paint. The paint shall cover completely. <br />
The URL can be used to link to this page
Your browser does not support the video tag.