Browse
Search
2004 NS Housing- Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2004
>
2004 NS Housing- Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:41:47 AM
Creation date
3/31/2011 8:39:49 AM
Metadata
Fields
Template:
BOCC
Date
11/16/2004
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5l
Document Relationships
Agenda - 11-16-2004-5l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2004\Agenda - 11-16-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: James Grady <br />Address: 205 Rencher St. <br />City: Hillsborough, NC 27278 <br />Phone Number: 245-1298 <br />Date: July 1, 2004 <br />PLUMBING: <br />Install a new double bowl stainless steel sink, single lever faucet <br />& sprayer. The faucet shall be a Delta orpre-approved equal. <br />Install a new PVC drain line assembly, cut-offs, supply lines & <br />mechanical vent. (Kitchen location) <br />4. Contact a septic tank pumping company. Pump the septic tank. <br />ELECTRICAL: <br />1. Install a new outdoor main lug load center below the meter base. <br />Install a new main breaker. Make all electrical connections. <br />7 <br />2. Install a new GFI receptacle in the kitchen. <br />3. Install new GFI receptacles in both bathrooms. <br />4. Install a new wall switch & box in the left front bedroom. Make <br />all electrical connections. <br />5. Re-install the loose receptacles in both bedrooms. <br />6. Install a new weatherproof receptacle cover &GFI receptacle <br />beside the front door. Make all electrical connections. <br />7. Install a new exterior light fixture beside the front door. Make all <br />electrical connections. <br />8. Install hard-wired smoke detectors in all bedrooms, living room & <br />hallway. Install a total of four (4) smoke detectors. Make all <br />electrical connections. <br />9. Install arc-fault breakers on all sleeping room circuits. <br />10. Install a new 220 receptacle for the oven. Secure the box/receptacle <br />to the wall. Make all electrical connections. <br />11. Install a new vent-less range hood in the kitchen. Make all <br />electrical connections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.