Browse
Search
2004 NS Housing- Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2004
>
2004 NS Housing- Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:41:47 AM
Creation date
3/31/2011 8:39:49 AM
Metadata
Fields
Template:
BOCC
Date
11/16/2004
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5l
Document Relationships
Agenda - 11-16-2004-5l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2004\Agenda - 11-16-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: James Grady <br />Address: 205 Rencher St. <br />City: Hillsborough, N.C. 27278 <br />Phone Number: 245-1298 <br />Date: July 1, 2004 <br />ROOF: <br />1. Install a new galvanized roof shell over the existing roof. <br />The contractor shall verify all measurements and dimensions. <br />Remove the chimney flue. Install new plumbing & exhaust vents. <br />Install all necessary trim & mini gutters. <br />WINDOWS: <br />Install a new matching kitchen window. Install new matching trim <br />on the interior. The window shall beweather-tight. <br />INSULATION: <br />Repair all damaged & loose insulation in the crawlspace. Install <br />black board over the new insulation. Install treated wood strips & <br />6 mil poly. <br />2. Install a 6-mil vapor barrier in the crawlspace. <br />MECHANICAL: <br />1. Install a new propane heat/air system. The Mechanical Contractor <br />shall size the unit appropriately. Make all electrical & mechanical <br />connections. Install a gas line from the propane tank to the unit. <br />Install a new thermostat in a central location. Install new floor <br />registers in all rooms. Install heat/air system to code. <br />PLUMBING: <br />1. Install a PVC cleanout cap on the sewer line located in the back <br />yard. <br />6 <br />2. Install a new 40 gallon electric hot water located in the front <br />master bedroom closet. Make all plumbing & electrical connections <br />per code. _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.