Browse
Search
2004 NS Housing- Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2004
>
2004 NS Housing- Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:41:47 AM
Creation date
3/31/2011 8:39:49 AM
Metadata
Fields
Template:
BOCC
Date
11/16/2004
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5l
Document Relationships
Agenda - 11-16-2004-5l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2004\Agenda - 11-16-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: James Grady <br />Address: 205 Rencher St. <br />City: Hillsborough, NC 27278 <br />Phone Number: 245-1298 <br />Date: July 1, 2004 <br />EXTERIOR: <br />1. Remove the brick foundation wall at the front of the unit. <br />Use a brick saw to cut a straight line at the front left corner. <br />The foundation shall be removed to below ground level. <br />Add soil to level the grade at the exposed wall area. <br />Seed & straw the exposed soil. All brick & debris shall be <br />hauled to the landfill. <br />2. Install a treated crawlspace door & frame located at the front right <br />corner. Install a pressure treated 2x6 frame & 3/4 inch pressure <br />treated plywood. Install galvanized hinges & locking hasp. <br />3. Trim all brush to ground level at the front of the unit. Remove <br />all cut brush. Hand-rake the area to loosen the soil. Seed & straw <br />the exposed area. <br />4. Install a 5' x 5' front porch & steps. All wood shall be pressure <br />treated lumber. Install the porch floor tight against the door <br />threshold. Use 5/4 decking for the porch floor. Install a 2x10 outer <br />band. Install a 36" railing around the porch. Install handrails on <br />both sides of the steps. Install 2x2 pickets placed 4" apart on the <br />guardrail & handrail. All porch work shall meet the NC Building <br />Codes for Porches & Decks. <br />5. Remove ALL existing wood framing located near the back door. <br />Install a 5' x 5' treated landing level with the door threshold. <br />Install a 42" wide ramp leading to the driveway. The ramp slope <br />shall be a 1/12. The porch & ramp floor surface shall be 5/4 treated <br />decking. Install railings around the landing & ramp. All work <br />shall meet the NC Residential Codes for Porches & Ramps. <br />6. Remove one truck load ofhome-owner trash & debris. Remove <br />all appliances & debris from the yard. The truck size shall be <br />1 ton minimum. <br />
The URL can be used to link to this page
Your browser does not support the video tag.