Browse
Search
2004 NS Housing- Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2004
>
2004 NS Housing- Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:41:47 AM
Creation date
3/31/2011 8:39:49 AM
Metadata
Fields
Template:
BOCC
Date
11/16/2004
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5l
Document Relationships
Agenda - 11-16-2004-5l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2004\Agenda - 11-16-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Bernice White <br />Address: 206 W. Orange St. <br />City: Hillsborough, N.C. 27278 <br />Phone Number: 644-7785 <br />Date: October 1, 2004 <br />KITCHEN/DINING & HALL: <br />10. Prepare the ceiling for a texture. Fill and tape all areas that attention. <br />Sand the new sheetrock smooth. Prime the ceiling with astain- <br />block primer. Spray a texture on the kitchen, dining and hallway <br />ceilings. <br />19 <br />11. Prepare all painted trim for paint. Prime all areas that need attention. <br />Caulk all cracks in trim. Fill any nail holes with painters putty. Paint <br />The trim with semi-gloss latex paint. The paint shall cover <br />completely. <br />12. Install a washable wall covering on the kitchen wall over the base <br />cabinets. Remove the existing wall material. Install a PVC type wall <br />covering that is water resistant. Install all necessary trim to finish off <br />the top of the wall material. <br />13. Install a new disappearing in the hallway. Install new matching <br />casing. Prime the casing and door with an oil based primer. Paint <br />the trim and stairway door with semi-gloss latex paint. All paint <br />shall cover completely. <br />14. Prepare the hall walls for paint. Repair any damaged areas with <br />sheetrock filler. Prime the walls with an oil bonding primer. Paint <br />the walls with flat latex paint. The paint shall cover completely. <br />BATHROOM: <br />Remove the commode. Remove all particle board around the <br />commode. Install matching plywood. Prepare the floor for vinyl. <br />Install '/a" lauan plywood and a new vinyl floor. The vinyl to <br />cost not less than $ 14 sq yd. Install new shoe molding and metal <br />trim at the door opening. Prime and paint the shoe molding with <br />semi-gloss latex paint. The paint shall cover completely. <br />2. Prepare the sheetrock walls and ceiling for paint. Re-mud all <br />exposed tape joints and corners. Fill all nail holes. Sand all filler <br />smooth. Prime all new sheetrock filler. Paint the walls and ceiling <br />with semi-gloss latex paint. The paint shall cover completely. <br />
The URL can be used to link to this page
Your browser does not support the video tag.