Browse
Search
2004 NS Housing- Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2004
>
2004 NS Housing- Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:41:47 AM
Creation date
3/31/2011 8:39:49 AM
Metadata
Fields
Template:
BOCC
Date
11/16/2004
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5l
Document Relationships
Agenda - 11-16-2004-5l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2004\Agenda - 11-16-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Bernice White 1 ~ <br />Address: 206 W. Orange St. <br />City: Hillsborough, N.C. 27278 <br />Phone Number: 644-7785 <br />Date: October 1, 2003 <br />INSULATION: <br />1. Remove the insulation from the attic. Install R-30 insulation. <br />Install baffles as needed per code. <br />INTERIOR: <br />LIVING ROOM: <br />Install a six panel, metal insulated door unit with aluminum <br />threshold ,weather-stripping and matching casing. Install a <br />lockset and deadbolt keyed alike. Install a wide view peephole. <br />Prime the new casing with an oil based primer. <br />2. Install a full view aluminum storm door. The storm door to have <br />a pneumatic closure, vinyl sweep and limited lifetime warranty. <br />Door shall be complete with all hardware. <br />3. Prepare the ceiling for a sprayed texture. Fill all nail holes and <br />damaged areas with sheetrock filler. Sand all new sheetrock filler. <br />Prime the ceiling with a stain blocking primer. Spray a texture on <br />the ceiling. Install all needed plastic for over-spray. <br />4. Prepare all painted trim for paint. Caulk all cracks with latex caulk. <br />Fill all nail holes with painters putty. Paint all trim with semi-gloss <br />latex paint. The paint shall cover completely. <br />5. Prepare the front door for paint. Prime as necessary. Paint the door <br />with semi-gloss latex paint. The paint shall cover completely. <br />6. Install new carpet and pad. The carpet to cost not less than $ 14 sq. <br />yd. Install metal trim at the door opening to the kitchen. Trim all <br />doors that rub the carpet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.