Browse
Search
2011-071 AMS - H. M. Kern Corp for Change Order #1 for Health Department Renovations at Whitted Building $224,988 02-15-2011-4m
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-071 AMS - H. M. Kern Corp for Change Order #1 for Health Department Renovations at Whitted Building $224,988 02-15-2011-4m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2012 11:44:00 AM
Creation date
3/29/2011 8:59:11 AM
Metadata
Fields
Template:
BOCC
Date
2/15/2011
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4m
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 PiEDMUNT FIR~~ <br />i PROTECTION SYSTEMS <br />- Proposal - <br />SCOPE OF WORK <br />FIRE PROTECTION <br />3609 Bastion Lane, Raleigh, NC 27604 <br />919-212-2356 office • 919.212.2357 fax <br />E-mail: tvoncannon ~iedmontfire.com <br />North Carolina License 22451 FS Class ] <br />Date: Friday, March 11, 2011 <br />To: Project Manager Proposal No.: 8085-45-2011 <br />Sheet ~ No.: <br />City & State: Jab: Orange County Health Department Renovations <br />Attn: Location: <br />City 8 State: Hillsboro, North Carolina <br />Gentlemen: <br />We propose to famish labor and materials to instaA a Fire Protection System as described below at the abocre location, in accordance with the following: <br />We are pleased to provide you with our scope of work as listed below. All layout drawings, fabricated materials, <br />labor, equipment and supervision, is induded to provide the building as shown, on the contract drawings, with fire <br />protection system protection, with the following clarifications and exclusions. <br />• All piping and devices will be as per tJFPA 13, state and local requirements. <br />• Our work to start at a point 1'-0" AFF inside the new riser room. <br />Our proposal does not include any of the underground fire protection supply piping or devices outside the <br />structure. Our work starts at a point 9'-0" above fhe finished floor inside this building. The underground <br />piping is fo be provided by others at no cost to Piedmont <br />The FDC is to be a flush mounted on the exterior wall of this building and will be installed adjacenf to the <br />new sprinkler riser. <br />The Backflow device is to be installed remote from the building and is not included in our pricing. <br />Our pricing does not include a new fire alarm system. Our Pricing does include all supervisory switches to <br />interface with an alarm system. <br />The system demand is a minimum of 62 PSI flowing 497.5 GPM including the required 250 GPM hose albwance at <br />the base of the new riser. The density supplied by our design is a .1 GPM density over the most hydraulically remote <br />1,500 square feet of the light hazard areas and a density of .15 GPM over the most hydraulically remote 1,500 <br />square feel of the storage and mechanical rooms of the building. The design will meet the light hazard and Ordinary <br />Hazard Group 1, criteria for this buikting as per the specifications. All exterior wall penetrations to have schedule 10 <br />galvanized sleeves packed with Mineral Wool and sealed with plastic waterproof cement. <br />We have included protection as shown on the referenced drawings. In the absence of information we have assumed <br />the water supporting this wet fire protection is capable of delivering the water to the base of our new sprinkler <br />manifold at the pressure and volume noted above. <br />Drawings: Piedmont Fire Protection Systems will provide the following: fabricate and install the water base fire <br />protection system as indicated on the referenced drawings. We will provide scale drawings for the proposed work <br />within this new building. All ACCAD drawings and hard copies of this building as needed will be provided at no cast <br />to Piedmont. <br />Performance Under Pressure Turning Heads Since 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.