Browse
Search
2011-071 AMS - H. M. Kern Corp for Change Order #1 for Health Department Renovations at Whitted Building $224,988 02-15-2011-4m
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-071 AMS - H. M. Kern Corp for Change Order #1 for Health Department Renovations at Whitted Building $224,988 02-15-2011-4m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2012 11:44:00 AM
Creation date
3/29/2011 8:59:11 AM
Metadata
Fields
Template:
BOCC
Date
2/15/2011
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4m
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-~~~~„ „ ® TM ^ <br />-_,~~ Document G701 - 2001 Instructions <br />Change Order <br />GENERAL INFORMATION <br />Purpose <br />AIA Document G701 is for implementing changes in the Work agreed to by the Owner, Contractor and Architect. <br />Execution of a completed G701 indicates agreement upon all the terms of the change, including any changes in <br />the Contract Sum (or Guaranteed Maximum Price) and Contract Time. <br />Use of Current Documents <br />Prior to using any AIA Contract Document, users should consult www.aia.org or a local AIA component to verify <br />the most recent edition. <br />Reproductions <br />This document is a copyrighted work and may not be reproduced or excerpted from without the express written <br />permission of the AIA. There is no implied permission to reproduce this document, nor does membership in The <br />American Institute of Architects confer any further rights to reproduce this document. <br />The AIA hereby grants the purchaser a limited license to reproduce a maximum of ten copies of a completed <br />G701, but only for use in connection with a particular project. The AIA will not permit reproduction outside of the <br />limited license for reproduction granted above, except upon written request and receipt of written permission from <br />the AIA. <br />Rights to reproduce the document may vary for users of AIA software. Licensed AIA software users should <br />consult the End User License Agreement (EULA). <br />To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal <br />counsel, copyright@aia.org. <br />COMPLETING THE G701 FORM <br />Description of Change in the Contract <br />Insert a detailed description of the change or reference specific exhibits describing, in detail, the change to be <br />made in the Contract by this Change Order. Include any drawings, specifications, documents or other supporting <br />data to clarify the scope of the change. <br />Determination of Costs <br />Insert in the blanks provided, or strike out the terms in parentheses that do not apply, the original Contract Sum or <br />Guaranteed Maximum Price; the net change by previously authorized Change Order (note that this does not <br />include changes authorized by Construction Change Directive unless such changes were subsequently agreed to <br />by the Contractor and recorded as a Change Order); the Contract Sum or Guaranteed Maximum Price prior to this <br />Change Order; the amount of increase or decrease, if any, in the Contract Sum or Guaranteed Maximum Price; <br />and the new Contract Sum or Guaranteed Maximum Price as adjusted by this Change Order. <br />Change in Contract Time <br />Insert in the blanks provided, and strike out the unused terms in parentheses, the amount (in days) of the increase <br />or decrease, if any in the Contract Time. Also insert the date of Substantial Completion, including any adjustment <br />effected by this Change Order. <br />EXECUTION OF THE DOCUMENT <br />When the Owner and (Contractor, in occurrence with the Architect, have reached agreement on the change to be <br />made in the Contract, including-any adjustments in the Contract Sum (or Guaranteed Maximum Price) and <br />Contract Time, the G701 document should be executed in triplicate by the two parties and the Architect, each <br />retaining an original. <br />AIA Document G701 TM - 2001. Copyright ©1979, 1987, 2000, and 2001 by The American Institute of Architects. All rights reserved. WARNING: This <br />AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA®Document, <br />or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. <br />Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, a-mail <br />The American Institute of Architects' legal counsel, copyright@aia.org. <br />
The URL can be used to link to this page
Your browser does not support the video tag.