® TM <br />~_!_ <br />-_ Document G701 2001 <br />Change Order <br />PROJECT: (Name and address) <br />Orange Co. Health De=pt. <br />Renovations, Rie.:narryT . <br />Whitten Bldg, Hillsborough, <br />TO CONTRACTOR: (Nance and address) <br />H. M. Keri1 Corp. <br />160 Thatcher Ro~i <br />Greensboro, NC 27449 <br />OWNER ~' <br />ARCHITECT ^ <br />CONTRACTOR ^ <br />FIELD ^ <br />OTHER ^ <br />The Contract is changed as follows: <br />(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) <br />Fire protectiQn_ systetTt as requester by the Owner-in Bldg. "A" as retailed in <br />R~'P ~Ol. Cost reflects eli:mi.nation of the preā€¢-a~,tion systems ann galvanized <br />ttiateriat. Ceitiri,, repair ~itaterials trill be provided by t'ne Owner. Fir><31 cleaning <br />by others. Cost incluries an electri~l allowance of $5,000 for connection to <br />.fire ala~nln ... .................................Ai>O: $224,988.00 <br />The original (Contract Sum) (~~~~y,~) was S 763,$00_00 ~ <br />The net change by previously authorized Change Orders $ ~0_ ~? <br />The. (Contract Sum) ( prior to this Change Order was $ 7f,3~O0.Ot~ <br />The (Contract Sum) ( e) will be (increased).~~:(m) <br />by this Change Order in the amount of $ 2~4~988 ~ <br />The new (Contract Sum) (C7C~[~~I~i[Q@~ including this Change Order will be S 93$, 788.00 <br />The Contract Time will be (' ) (unchanged) by ( 0 )days <br />The date of Substantial Completion as of the date of this Change Order therefore is July 11, 2011. <br />(Note: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price <br />H~hich I~iat~e been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Otti~ner and Contractor; in which case a Change Order is executed to supersede the Construction Change Directive.) <br />CHANGE ORDER NUMBER: 001 <br />DATE: March 17, 2011 <br />N~RCHITECT'S PROJECT NUMBER: 1001 <br />CONTRACT DATE: February 16, 2011 <br />CONTRACT FOR: General Construction <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />Corley Reelfoot lack. Inc. <br />H. M. Kenn Co <br />Orange Cnunt <br />ARCHITECT (Firm name) <br />222 C101Ster Court <br />Cf~a~el Hill, NC 27517 <br />ADDRE 6 <br />~~ . <br />Y (Si re) <br />enlneth l;- Reelfoot, ATA <br />CONTRACTOR (Firm name) <br />160~Ihatcher Road <br />Greeensbc~r~_,_ N 2740'9 <br />ADD S ~ ~/~ <br />BY (Signature) <br />/~ETFi2 ~t~Kui2cr-~ <br />OWNER (Firm name <br />PO Box 818 <br />Iiillsborough. NC 27278 <br />ADDRESS <br />~ '' <br />B S' nature) <br />(Typed nr ne) (Typed name) (Typed name) <br />_3 I7 ~Ofl 3-t?~ ~t __ ~ - 2~-i~ <br />DATE DATE DATE <br />CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that <br />changes will not be obscured. <br />AIA Document G701 TM - 2001. Copyright ©1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This <br />AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, <br />or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. <br />Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, a-mail <br />The American Institute of Architects' legal counsel, copyright@aia.org. <br />