Orange County NC Website
<br />Drab ~ a~~J~a~ <br />appraval of bath Jaunty and Town ,Boards of Cammissianers, and shall consist of the <br />follawing charge and rnernbe~•ship; <br />A, ~ARG~ to the 1V~aster Plan am~ittee~ <br />Develop ~ 1Vlaster Plan for the bite, within the framework ol` ~~~ operating guidelines ar <br />other instructions as offered by the elected Boards, to include the following; <br />l , A. map of the bite with the design far the Fairview Park, including proposed <br />buildings, playing fields, roads, parking, other f acilities, amen~tles, infrastructure <br />locations, vegetative cover, hydrology and other components that are camn~only <br />included In ~ park or public faclllty concept planF The map of the ~ bite shall <br />include existing and planned huildin.gs of the Jaunty Parks operations Base and <br />the Town and bounty Public forks facilities; Planning of the bounty Parrs <br />operations Base and the Tawn and Jaunty Public works facilities is limited to <br />the location of buildings, xoad, parl~ing anal other infrastructure <br />~. A written report autli~~ing the proposed uses, the design rationale, description of <br />work group process, natural and cultural features, means of soliciting corr~munity <br />input, the potential future phases, and construction cost estimates. If needed, the <br />report should also Include a phasing plan, showing haw the Fair~ie~v Park and <br />other pul~l~e facllltl~s could ~~ developed over t~n1e 1n ~ cost-efficient fashion <br />'The repot should address and recagni~e the limitations impaled by safety <br />cons~deratlar~s caused ~ the Fa~r~~ew park s~te~s pre~lous use far waste~disposal, <br />as addressed inpart by a geo-technical report prepared in f99 ~"Depart of <br />eatechr~ieal ~valuatior~, lased H1llsbarough ~andflll lte, July ~ 9, 20DD"}. <br />Fuher recommendatio~is may be needed to address phased re~nediatian of <br />portions of the Fairview park site <br />4. The Master Plan should address co-lacatlan of e~stlr~g and future public faclllt~eS <br />and provide for a synergy and compatibility of uses between park functiorxs and <br />other public fur~ct~ons wherever possible. <br />~. The amrnittee should review the "olds' l9SS Faiiew Park ancept Plan as part <br />of the faster Plan anti deterr~~ine its validity, if any. <br />~, ~P~~TA~TII~ ~F ,~T~__~~A~~ F~NA~ _~R~~UT 1 ~EE~~IIP ~F <br />N~A~TER PLAN ~~'I~'~'~EE <br />Product ,A faster Plan ~~eport and rnap, as described above, <br />Timefra~ne foar Prodact; by Se,~~er~~~e~; X005 <br />Final steps; once completed, the faster Plan will be submitted to both Boards of <br />o~nmissianers l`or approval. The Boards may approve the Plan, remand it back far further <br />work, ldent~fy revls~orls and alternatives, D~` decide not t0 pursue the 1Vlaster Planf <br />