Exhibit A
<br /> THE PROJECT
<br />Orange County Board of Education Middle School #3 & Ora nge Count y West Te n Soccer Complex
<br />Sitework/Improvements; Contract Costs; Contr act Cost Division between Orange County
<br />~ ("Soccer Complex") and Orange County B
<br />I oard of Education ("School Site")
<br /> school Sooaer
<br />Item Qty UfP Site Qty UIP Cornptex Extension
<br />f~ioo. and Genera! Conditia~s
<br />' 1.00 50,1 10.00 50,110.80 1.00 34,600.00 34,600.00 84,710.00
<br />Clear and Gnub
<br />i 16.OD 4,600.00 73,600.OD 19.00 4,600.00 87,400.00 181,000,00
<br />Tree prof fence 5,600.00 2.10 11,78D.OD 4,100.00 2.10 8,61 D.00 20,370.00
<br />i ~ Erosion Control •
<br />• Const entrance 1.00 5,450.00 5,450.00 1.00 9,400.00 3,400.00 8,850.00
<br />Si11 fence 1,800.00 2.50 9,500.00 1,900.00 2.b0 4.750.00 14,250.00
<br />Temp div ditch 3,000.00 2,00 6,OOD.QO 1,800.00 2.OD 3,600.00 9,800.00
<br />Basins 3.00 18,400.00 55,200.OD 1.00 20,650.00 20,850.00 75,850.00
<br />Mainlenanoe 1.00 6,500.00 6,500.00 1.00 4,600.00 4,600.00 11,100.00
<br />Grading •
<br />Striptopsoii ?.3,700.00 1.50 35,550.00 15.400,00 1.50 23,(00.00 58,650.00
<br />CUtlft{I 87,500.00 . 2.00 175,000.00 _rit3,400.00 2.00 112,800.00 287,800.00
<br />Respread lapsoil
<br />I 15,500.00 1.90 29,450.00 10,300.00 1.90 19,570.00 49,020.00
<br />.
<br />Seed 28.00 9D0.00 25,200,00 18.00 900.00 16,200.00 A1,40D.00
<br />A{tovrances
<br />i~iao3 i~wn ~ 5t;^v.'~D 12.OD
<br />~ v,^vu^D.v^v u,w~.vD
<br />Trench i:ack .• 5t).DO 35.00 i,7~.00 1,7;O.OD
<br />1Jndarcutirepiace 1,t)OO.bO ff.00 d,0ii0.c~0 g,OUC~.i}u
<br />
<br />i Subtotal -School 491,320.00 ~ Subtota{ - Succer 347,030.00
<br />
<br />f •
<br />~, Conttac! Total 838,350.00
<br />. I
<br />• ; ~.
<br />aD
<br />t'
<br />
<br />
|