Orange County NC Website
36 <br /> <br />1. <br /> <br /> <br />• <br /> <br />• <br /> <br />• • ~ <br />452,000 CY Remaining <br />70 Months <br />January 2016 <br /> <br />Revise slopes from 4:1 to 3:1 <br />Less than 10% capacity <br />increase <br />Additional 191,591 CY or <br />126,450 tons _, , _ <br />Advanta es <br />• No public involvement process <br />• Extended site life <br />• Additional tipping fees ($50 x 126,450 extra tons = <br />$6,322,500) compared to existing permitted capacity <br />• Easily constructed and maintained side slopes <br />• Does not exceed existing permitted height <br />• Consistent with existing slope construction <br /> <br />• <br />No additional cell construction <br />Disadvantases <br />• Does not maximize potential airspace <br />• Extended site life may have negative impact on <br />public perception <br />2. 530,000 CY Remaining Advantaees <br /> 82 Months Extended site life <br /> January 2017 . Additional tipping fees ($50 x 177,930 extra tons = <br /> $8,896,500) compared to existing permitted capacity <br />• Revise slopes from 4:1 to 3:1 • Easily constructed and maintained side slopes to <br />• Maximum landfill height achieve maximum airspace <br />• Additiona1269,591 CY or • Consistent with existing slope construction <br /> 177,930 tons • No additional cell construction <br /> Disadvantaees <br /> • Public involvement process <br /> • Construction permit application renewal (5-yr permit) <br /> • Slightly increases overall landfill height <br /> • Extended site life may have negative impact on <br /> public perception <br />3. 617,000 CY Remaining Advantaees <br /> 96 Months • Extended site life <br /> March 2018 • Additional tipping fees ($50 x 235,350 extra tons = <br /> $11,767,503) compared to existing permitted <br />• Revise slopes from 4:1 to 3:1 capacity <br />• Maximum landfill height • Maximum airspace <br />• Includes slope wedge • No additional cell construction <br />• Additiona1356,591 CY or Disadvantaees <br /> 235,350 tons • Public involvement process <br /> • Construction permit application renewal (5-yr permit) <br /> • Slightly increases overall landfill height <br /> • Considerable difficulty in constructing wedge <br /> airspace recovery over existing constructed side <br /> slopes <br /> • Extended site life may have negative impact on <br /> public perception <br />