Browse
Search
Agenda - 03-24-2011 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 03-24-2011
>
Agenda - 03-24-2011 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 4:28:59 PM
Creation date
3/21/2011 12:19:06 PM
Metadata
Fields
Template:
BOCC
Date
3/24/2011
Meeting Type
Municipalities
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 03-24-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
36 <br /> <br />1. <br /> <br /> <br />• <br /> <br />• <br /> <br />• • ~ <br />452,000 CY Remaining <br />70 Months <br />January 2016 <br /> <br />Revise slopes from 4:1 to 3:1 <br />Less than 10% capacity <br />increase <br />Additional 191,591 CY or <br />126,450 tons _, , _ <br />Advanta es <br />• No public involvement process <br />• Extended site life <br />• Additional tipping fees ($50 x 126,450 extra tons = <br />$6,322,500) compared to existing permitted capacity <br />• Easily constructed and maintained side slopes <br />• Does not exceed existing permitted height <br />• Consistent with existing slope construction <br /> <br />• <br />No additional cell construction <br />Disadvantases <br />• Does not maximize potential airspace <br />• Extended site life may have negative impact on <br />public perception <br />2. 530,000 CY Remaining Advantaees <br /> 82 Months Extended site life <br /> January 2017 . Additional tipping fees ($50 x 177,930 extra tons = <br /> $8,896,500) compared to existing permitted capacity <br />• Revise slopes from 4:1 to 3:1 • Easily constructed and maintained side slopes to <br />• Maximum landfill height achieve maximum airspace <br />• Additiona1269,591 CY or • Consistent with existing slope construction <br /> 177,930 tons • No additional cell construction <br /> Disadvantaees <br /> • Public involvement process <br /> • Construction permit application renewal (5-yr permit) <br /> • Slightly increases overall landfill height <br /> • Extended site life may have negative impact on <br /> public perception <br />3. 617,000 CY Remaining Advantaees <br /> 96 Months • Extended site life <br /> March 2018 • Additional tipping fees ($50 x 235,350 extra tons = <br /> $11,767,503) compared to existing permitted <br />• Revise slopes from 4:1 to 3:1 capacity <br />• Maximum landfill height • Maximum airspace <br />• Includes slope wedge • No additional cell construction <br />• Additiona1356,591 CY or Disadvantaees <br /> 235,350 tons • Public involvement process <br /> • Construction permit application renewal (5-yr permit) <br /> • Slightly increases overall landfill height <br /> • Considerable difficulty in constructing wedge <br /> airspace recovery over existing constructed side <br /> slopes <br /> • Extended site life may have negative impact on <br /> public perception <br />
The URL can be used to link to this page
Your browser does not support the video tag.