Browse
Search
Agenda - 03-17-2011 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 03-17-2011 - Work Session - Late
>
Agenda - 03-17-2011 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 4:15:38 PM
Creation date
3/14/2011 2:35:41 PM
Metadata
Fields
Template:
BOCC
Date
3/17/2011
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 03-17-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name <br />Functional Service Area <br />Professional Design Services <br />LandBuilding <br />Construction /Repairs/Renovations <br />Equipment/Furnishings <br />Total Project Budget <br />General Fund Related Operating Costs <br />Personnel Services <br />Operations <br />New Debt Service <br />Total Operating Costs <br />Revenues/Funding Source <br />Transfers from General Fund <br />Total <br />Project Description /Justification <br />Water & Sewer Utilities Capital Projects <br />Fiscal Years 2011 -16 <br />Lake Orange Capital Maintenance <br />Community and Environment <br />Planning <br />Project Status <br />Starting Date <br />Completion Date <br />Recommended <br />71112009 <br />913012013 <br />Current <br />Prior Years Fiscal Year <br />Funding 2010 -11 <br />Year 1 <br />Fiscal Year <br />2011 -12 <br />Year 2 <br />Fiscal Year <br />2012 -13 <br />Year 3 Year 4 Year 5 <br />Fiscal Year Fiscal Year Fiscal Year <br />2013 -14 2014 -15 2015 -16 <br />Five <br />Year <br />Total <br />Year 6 <br />to <br />Year 10 <br />35,310 <br />129,690 <br />35,000 <br />77,000 <br />69,300 <br />35,000 <br />146,300 <br />165,000 <br />112,000 <br />69,300 <br />- - - <br />181,300 <br />165,000 I 112,000 69,300 181,300 <br />IUU'VVU - I -I-IA,000 b8,3UU - - - 181.3001 - <br />Lake Orange has been in operation since the late 1960s. Besides minor repairs and mowing of the dam, there has been no routine maintenance performed on the dam or <br />spillway over the last 40 years. In 2009, engineering staff initiated an inspection of the dam by a qualified engineer to identify and quantify some suspected deficiencies in <br />the dam and spillway. The result of this inspection was a report that prioritized several necessary repairs and suggested other ongoing maintenance items. The most <br />urgent of these repairs are going to be completed this fiscal year and are part of the capital project listed above. Also included in the capital project listed is a project to <br />modernize the gate technology at the Lake by installing a new gate that will be controlled electronically and can be monitored and adjusted remotely. The remainder of the <br />necessary rehabilitation suggested by the engineering inspection has been spread over the next three fiscal years. After that, the routine maintenance suggested will not be <br />part of a capital project, but will become part of the annual operation and maintenance budget for Lake Orange. <br />• • • 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.