Browse
Search
Agenda - 03-17-2011 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 03-17-2011 - Work Session - Late
>
Agenda - 03-17-2011 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 4:15:38 PM
Creation date
3/14/2011 2:35:41 PM
Metadata
Fields
Template:
BOCC
Date
3/17/2011
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 03-17-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • • <br />County Capital Projects <br />Fiscal Years 2011 -16 <br />Project Name <br />Functional Service Area <br />Department <br />Robert & Pearl Seymour Senior Center <br />Governing and Management <br />Asset Management Services <br />Available Year 1 <br />Year 2 <br />Project Status <br />Starting Date <br />Completion Date <br />Year 3 Year 4 Year 5 <br />Recommended <br />7/1/2012 <br />613012013 <br />Five Year 6 <br />Project Budget <br />Prior Years Balances Fiscal Year <br />Funding 2/28/2011 2011 -12 <br />Fiscal Year <br />2012 -13 <br />Fiscal Year Fiscal Year Fiscal Year <br />2013 -14 2014 -15 2015 -16 <br />Year <br />Total <br />to <br />Year 10 <br />Appropriation <br />Land/Building <br />Construction /Repairs/Renovations <br />Generator, Design <br />60,000 <br />60,000 <br />Equipment/Furnishings <br />Total Project Budget <br />- <br />- 60,000 - - 60,000 <br />General Fund Related Operating Costs <br />Personnel Services <br />Operations <br />New Debt Service <br />- <br />- - - <br />Total Operating Costs <br />Revenues/Funding Source <br />Transfer from General Fund <br />Debt Financing <br />Total <br />60,000 <br />60,000 <br />- - 60,000 - - - ov,wU - <br />Project Description/Justification <br />The Seymour Center was originally designed to be "generator ready ", which means in the event of an emergency, a generator would be brought on site to <br />provide power to the Center. Availability of equipment the size and type that would be needed have become increasingly difficult to access on an "on -call' <br />basis. Availability, delivery and set up within the timeframe needed to set up sheltering operations at this site cannot be guaranteed. In order to ensure the <br />facility is prepared in the event it is called into service as a sheltering option, the purchase and installation of a permanent generator is recommended. <br />H1:j <br />
The URL can be used to link to this page
Your browser does not support the video tag.