Browse
Search
Agenda - 03-15-2011- 7b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 03-15-2011
>
Agenda - 03-15-2011- 7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2011 4:49:30 PM
Creation date
3/10/2011 4:49:27 PM
Metadata
Fields
Template:
BOCC
Date
3/15/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7b
Document Relationships
Minutes 03-15-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
RES-2011-026 Resolution Providing Comments to NC Dept. of Transportation Regarding Draft 2011–2020 State Transportation Improvement Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2011
RES-2011-027 Resolution Providing Comments to DCHC Transportation Advisory Committee Regarding Draft 2012-2018 Metropolitan Transportation Improvement Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br />4. B-5348, Old Greensboro Road (SR 1005), replace bridge number 85 over Phil's Creek: <br />Orange County recommends accelerating this project. The Draft STIP proposes <br />replacement of this bridge in 2019. NCDOT has programmed his portion of Old <br />Greensboro Road to be resurfaced in 2011 and Orange County has requested 2' paved <br />shoulders be included in the repaving project. The bridge will not handle being repaved <br />and has been patched repeatedly to repair recurring potholes. Old Greensboro Road is <br />identified in the Orange County Bicycle Plan and the DCHC Long Range Transportation <br />Plan as a priority bicycle route, and is part of the NCDOT Mountains to Sea Bicycle Route <br />(Route 2). <br />5. Project I-0305, widen I-85 to six lanes and reconstruct interchanges and structures: <br />Orange County requests that NCDOT consider comments submitted for previous TIP <br />updates by Orange County regarding the I-85 widening project. The OUTBoard requests <br />the following based on previous County comments: <br />• Provide, in consultation with county staff, sidewalks and bike lanes along <br />roads where interchange improvements are required, and to include adequate <br />guardrails on overpasses; <br />• Provide 12' wide travel lanes and 4' wide bicycle lanes for a total paved width <br />of 32' for any roads that may be relocated as part of the project (NCDOT <br />Division of Highways Planning and Environmental Branch has previously <br />indicated that Herman Church Road, SR 1713, and Old NC 10, SR 1710, may <br />be relocated as part of I-305); <br />• Widen the overpass on NC 86 to accommodate increased traffic volumes <br />resulting from recent development in the adjacent Economic Development <br />District; <br />• As part of the project, widen NC 86 from US 70 A to Old NC 10, SR 1710, <br />including bicycle lanes and sidewalks; and <br />Consult with county staff regarding design of the US 70 interchange to: <br />- To bring to the attention of the NCDOT Staff Biologist, the proposed <br />construction of a wildlife corridor under I-85 in the vicinity of US70 <br />Interchange, as recommended in the "The New Hope Corridor Open <br />Space Master Plan: Proposals for Linking Duke Forest and Eno River <br />State Park"; and <br />- To provide a pedestrian trail under I-85 linking New Hope Creek and the <br />Eno River (New Hope Rustic Woodland Trail proposed as an element of <br />the Lands Legacy Program). <br />6. Projects to alleviate congestion in downtown Hillsborough <br />Orange County requests that studies be programmed for projects to alleviate congestion <br />in downtown Hillsborough, now that the Elizabeth Brady Road Extension project has been <br />canceled. These projects include: <br />• R-2825, South Churton Street improvements from I-40 to the Eno River; <br />• U-3436, Realignment of the Eno Mountain and Mayo Street intersections with <br />Orange Grove Road; <br />• Anew. project to extend Orange Grove Street to US 70 A; and <br />• Anew project to widen NC 86 from US 70 Bypass to NC 57 with intersection <br />improvements at US 70. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.