Orange County NC Website
Attachment 1 <br />4. B-5348, Old Greensboro Road (SR 1005), replace bridge number 85 over Phil's Creek: <br />Orange County recommends accelerating this project. The Draft STIP proposes <br />replacement of this bridge in 2019. NCDOT has programmed his portion of Old <br />Greensboro Road to be resurfaced in 2011 and Orange County has requested 2' paved <br />shoulders be included in the repaving project. The bridge will not handle being repaved <br />and has been patched repeatedly to repair recurring potholes. Old Greensboro Road is <br />identified in the Orange County Bicycle Plan and the DCHC Long Range Transportation <br />Plan as a priority bicycle route, and is part of the NCDOT Mountains to Sea Bicycle Route <br />(Route 2). <br />5. Project I-0305, widen I-85 to six lanes and reconstruct interchanges and structures: <br />Orange County requests that NCDOT consider comments submitted for previous TIP <br />updates by Orange County regarding the I-85 widening project. The OUTBoard requests <br />the following based on previous County comments: <br />• Provide, in consultation with county staff, sidewalks and bike lanes along <br />roads where interchange improvements are required, and to include adequate <br />guardrails on overpasses; <br />• Provide 12' wide travel lanes and 4' wide bicycle lanes for a total paved width <br />of 32' for any roads that may be relocated as part of the project (NCDOT <br />Division of Highways Planning and Environmental Branch has previously <br />indicated that Herman Church Road, SR 1713, and Old NC 10, SR 1710, may <br />be relocated as part of I-305); <br />• Widen the overpass on NC 86 to accommodate increased traffic volumes <br />resulting from recent development in the adjacent Economic Development <br />District; <br />• As part of the project, widen NC 86 from US 70 A to Old NC 10, SR 1710, <br />including bicycle lanes and sidewalks; and <br />Consult with county staff regarding design of the US 70 interchange to: <br />- To bring to the attention of the NCDOT Staff Biologist, the proposed <br />construction of a wildlife corridor under I-85 in the vicinity of US70 <br />Interchange, as recommended in the "The New Hope Corridor Open <br />Space Master Plan: Proposals for Linking Duke Forest and Eno River <br />State Park"; and <br />- To provide a pedestrian trail under I-85 linking New Hope Creek and the <br />Eno River (New Hope Rustic Woodland Trail proposed as an element of <br />the Lands Legacy Program). <br />6. Projects to alleviate congestion in downtown Hillsborough <br />Orange County requests that studies be programmed for projects to alleviate congestion <br />in downtown Hillsborough, now that the Elizabeth Brady Road Extension project has been <br />canceled. These projects include: <br />• R-2825, South Churton Street improvements from I-40 to the Eno River; <br />• U-3436, Realignment of the Eno Mountain and Mayo Street intersections with <br />Orange Grove Road; <br />• Anew. project to extend Orange Grove Street to US 70 A; and <br />• Anew project to widen NC 86 from US 70 Bypass to NC 57 with intersection <br />improvements at US 70. <br />6 <br />