Orange County NC Website
Attachment 6 28 <br />ORANGE COUNTY PRIORITY PROJECTS SUBMITTED DURHAM-CHAPEL HILL- <br />CARRBORO METROPOLITAN PLANNING ORGANIZATION <br />ORANGE STATUS <br />COUNTY DESCRIPTION DRAFT 2011-2020 STIP <br />PRIORITY <br />DCHC TIP Project No. EB-4980 - SR 1006 Feasibility study completed - to be <br />MPO (Orange Grove Road) pedestrian removed from STIP; <br />#1 bridge over Interstate 40 Added in Draft MTIP for construction in <br /> 2019 <br />DCHC Hillsborough Train Station <br />MPO #2 <br />DCHC TIP Project No.R-2825 - SR 1009 Not included in Draft STIP; scheduled for <br />MPO #3 (South Churton Street) Improvements reprioritization in 2012. <br /> Added in Draft MTIP for 2019 and <br /> construction in 2020 <br />DCHC SR 1009 (Old NC 86) bicycle facilities Not included in Draft STIP. <br />MPO #4 <br />DCHC SR 1006 (Orange Grove Road) Not included in Draft STIP; scheduled for <br />MPO #5 extension to US 70 A reprioritization in 2012. <br /> New TIP project added in Draft MTIP for <br /> ri ht-of-wa ac uisition in 2020 <br />DCHC Tip Project No. U-3436 -intersection Not included in Draft STIP; scheduled for <br />MPO #6 realignment of SR 1148 (Eno reprioritization in 2012. <br /> Mountain Road) and SR 1192 (Mayo Added to in Draft MTIP for right-of--way <br /> Street) at SR 1006 (Orange Grove acquisition in 2020 <br /> Road <br />DCHC U-2805, SR 1777 (Homestead Road) Not included in Draft STIP; scheduled for <br />MPO #7 improvements to include bicycle reprioritization in 2012. <br /> lanes and sidewalks Not in Draft MTIP. <br />DCHC SR 1727 (Eubanks Road) bicycle Not included in Draft STIP. <br />MPO #8 lanes Resurfacing programmed for 2011 to <br /> provide 2'; paved shoulders. <br />DCHC SR 1008 (Mt. Carmel Church Road) Not included in Draft STIP. <br />MPO #9 bic cle lanes <br />DCHC US 70 Bypass widening: Not included in Draft STIP. <br />MPO #10 <br />DCHC NC 86 (North of Hillsborough) Not included in Draft STIP. <br />MPO #11 improvements with intersection New Project included in Draft MTIP fro <br /> improvements at US 70 b pass 2020 <br />DCHC NC 86, bicycle facilities from SR Not included in Draft STIP. <br />MPO #12 1730/SR 1731 (Whitfield Road) to US <br /> 70 A <br />