Browse
Search
Agenda - 03-15-2011- 7b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 03-15-2011
>
Agenda - 03-15-2011- 7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2011 4:49:30 PM
Creation date
3/10/2011 4:49:27 PM
Metadata
Fields
Template:
BOCC
Date
3/15/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7b
Document Relationships
Minutes 03-15-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
RES-2011-026 Resolution Providing Comments to NC Dept. of Transportation Regarding Draft 2011–2020 State Transportation Improvement Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2011
RES-2011-027 Resolution Providing Comments to DCHC Transportation Advisory Committee Regarding Draft 2012-2018 Metropolitan Transportation Improvement Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAC 2/9/2011 <br />Route ID Descri tion/MilesJCost Cha' es <br />Durham TE- Fixed Guidewajr Light Rail - Added Durham County, Changed to <br />Orange 4706Bu Alternatives Analysis, PE & Design - Triangle Transit <br /> Durham-Cha el Hill <br />Additions to Draft STIP <br />'Route ID ' Descri tion/Miles/Cost <br />NC 54 New TIP I-40 to Fordham Blvd.; feasibility study that considers results of <br /> project MPO's NC 54 Study and includes roadway, bicycle, pedestrian and <br /> transit improvements. <br /> • 1.7 miles <br /> Add funding for short-term recommendations of the NC 54 corridor <br /> study in FY 2016-2020. (Use draft report recommendations as <br /> placeholder for final report recommendations.) <br /> Short-term improvements in draft report: <br /> • Park-n-Ride: $1,795,000 capital, $720,000 operating <br /> • Transit: $2,100,000 capital, $4,066,200 operating <br /> • Bicycle and Pedestrian $6,820,000 <br /> • Roadway $6,100,000 (without collector street network) <br /> • Total: $21,601,200 <br />Fayetteville Road New TIP Woodcroft Pkwy to Riddle Rd.; widen to multilane and include <br /> project bicycle, pedestrian and transit improvements; add $7 million in <br /> funding each year from FY 2016 through 2018. <br /> • 2.3 miles <br /> • $21 million <br />Erwin Road New TIP US 15-501 to NC 751; construct bicycle lanes, sidewalks and safety <br /> project improvements; add $5.5 million in funding in FY 2016. Statewide <br /> STP Enhancement program is suggested funding source. <br /> • 5.5 miles <br /> • $5.5 million <br />Jack Bennett Road New TIP US 15-501 to Lystra Rd.; safety improvements; add $6.9 million in <br /> project funding in FY 2016. <br /> • 2.3 miles <br /> • $6.9 million <br />Churton Street R-2825 US 70 Business to I-40; congestion mgmt., aesthetic and capacity <br /> improvements; add $9.5 million each year in FY 2019 and 2020. <br /> • 2.5 miles <br /> • $19 million <br />Eno Mountain Road U-3436 Eno Mtn. Rd. and Mayo St. aligmnent; add $2.4 million in funding in <br /> FY 2020. <br /> • $2.4 million <br />NC 86 New TIP US 70 Bypass to Coleman Loop Rd.; widen to multilanes; add $7.5 <br /> project million in funding in FY 2020. <br /> • 0.42 mile <br /> • $7.5 million <br />25 <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.