Browse
Search
Agenda - 03-15-2011- 7b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 03-15-2011
>
Agenda - 03-15-2011- 7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2011 4:49:30 PM
Creation date
3/10/2011 4:49:27 PM
Metadata
Fields
Template:
BOCC
Date
3/15/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7b
Document Relationships
Minutes 03-15-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
RES-2011-026 Resolution Providing Comments to NC Dept. of Transportation Regarding Draft 2011–2020 State Transportation Improvement Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2011
RES-2011-027 Resolution Providing Comments to DCHC Transportation Advisory Committee Regarding Draft 2012-2018 Metropolitan Transportation Improvement Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAC 2/9/2011 <br />Draft MTIP <br />The Local Supplement is the draft State TIP developed by the NCDOT. The DCHC MPO uses the <br />Local Supplement as a basis to develop the draft Metropolitan TIP. The draft MTIP indicates what <br />changes were made to the Local Supplement. The tables below show which projects were changed <br />in the Local Supplement and which projects were added to it to form the draft MTIP. <br />Changes to Draft STIP <br />Route ID Descri tion/Miles/Cost. 'Chan es <br />I-40 I-3306 I-85 in Orange Co. to US-15-501; add Define Phase A as NC 86 to Durham <br /> additional lanes. County Line (westbound) and Phase C <br /> • 20.7 miles as I-85 to NC 86 and NC 86 to <br /> • $47 million Durham County Line (eastbound) <br /> (Phase B is completed Durham <br /> County project) <br /> Fund Phase A in FY 2016 and FY <br /> 2017 for $10,208,000. <br /> Phase C $36,792,000 unfunded in post <br /> ear. <br />I-85 I-0305 I-40 at Hillsborough to Durham County Include widening of NC 86 from US <br /> Line. Widen to six lanes and reconstruct 70A to Old NC 10. <br /> interchan es and structures. <br />Old EB-4707 Garrett Rd. to US 15-501; bicycle and Add $lmillion in funding in FY 2012. <br />Durham/ pedestrian improvements. (Placeholder for potential cost <br />Chapel • 2.7 miles increase.) <br />Hill Rd . $4 million <br />US 15- U-5304 S. Columbia St. to Ephesus Ch. Rd.; Accelerate by three years, thus <br />501 sidewalks, wide outside lanes and transit construction starts FY 2016. <br /> accommodations. Include roadway, transit, bicycle and <br /> • 4 miles pedestrian improvements consistent <br /> • $5.1 million with recommendations of the Ephesus <br /> Church Road/Fordham Boulevard <br /> Transportation Study. <br /> + $5 million <br />NC 54 FS-1005C I-40 to NC 55 in Ciry of Durham; Add $30.333 M in FY 2017, FY 2018, <br /> feasibility study and FY 2019 to fully fund the project. <br /> • 5.2 miles <br /> • $91 million <br />Durham TN-5102 New Freedom -Beyond Am. Disability Delete -redundant with TM-5129B <br />Oran e Act Re uirements <br />Durham TM-5123B Job Access /Reverse Commute: Capital, Added Chatham County, funding <br />Orange Planning, Operating Cost amounts to be updated <br />Chatham <br />Durham TM-5129B New Freedom -Beyond Am. Disability Added Chatham County, funding <br />Orange Act Requirements amounts to be updated <br />Chatham <br />Durham TE- Fixed Guideway: Light Rail Service - Added Durham County, Changed to <br />Oran e 4706Au Durham-Cha el Hill Ri ht-of-wa Tiian le Transit <br />24 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.