Browse
Search
Agenda - 09-09-2004 - 9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 09-09-2004
>
Agenda - 09-09-2004 - 9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2011 1:00:06 PM
Creation date
3/1/2011 1:00:01 PM
Metadata
Fields
Template:
BOCC
Date
9/9/2004
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 20040909
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MEMORANDUM <br />TO: ~ Chapel HilUOrange County Project Planning Committee (PPC) <br />FROM: Bill Webster, Assistant Director of Parks and Recreation <br />SUBJECT: Preliminary Cost Estimates for Design Services for Phase III of the Bolin Creek Trail <br />DATE: July 15, 2004 <br />This memorandum addresses questions related to the costs of design services for phase III of the Bolin <br />Creek Trail. <br />We know that because of the physical constraints along this section of Bolin Creek that the proposed <br />Phase III project would be one of the most difficult greenways projects to design and build. We have <br />asked a local firm to estimate the costs based on the best available information at this time. They have <br />provided us the following estimates for design services: <br />Phase A -Concept Plan ($125,000 -175,000) <br />This would involve evaluation of existing conditions, surveys, geotechnical investigation, flood plain <br />modeling for bridges and improvements near the stream, and attendance at meetings throughout the <br />process. This phase would identify the ultimate trail alignment and a logical phase that could be built with <br />existing funds. <br />Phase B -Final Construction Documents ($180,000 - 225,000) <br />Fees would pay for detailed construction documents. Construction administration would not be covered <br />by this fee estimate. <br />The Town Council has agreed to provide the initial $100,000 required to start design work through the <br />issuance of Parks bonds in 2004. We believe that if the County could provide up to $75,000 this year we <br />could begin the design process in 2004 and possibly complete the concept plan in late 2005. <br />
The URL can be used to link to this page
Your browser does not support the video tag.