Orange County NC Website
<br />Budget <br />Budget has not been determined at this time. However, we believe that a budget of <br />approximately $3,300,000 is possible. <br />Design Teams <br />Teams should include at a minimum persons with the following skills: <br />• Registered engineers specializing in floodplain modeling, civil issues, soils, <br />stormwater control and any other engineering specialties required by the project. <br />• Landscape Architects <br />• Persons familiaz with the processes required to secure needed permits and <br />approvals from all authorities with oversight control (i.e., FEMA, Army Corps of <br />Engineers, NCDOT, OWASA, Duke Power, etc.) <br />• Construction administration and oversight. <br />We are especially concerned that the successful firm should have extensive knowledge in <br />the design of facilities adjacent to active streams that might require extensive flood <br />modeling and permitting to satisfy local and federal floodplain regulations. <br />Working Relationships <br />The design team will work directly with a project manager appointed by the Town. The <br />design team will meet regularly with a Park Project Planning Committee (PPC), which <br />consists of elected officials from the Town and the County governments. The PPC will <br />review plans and give direction at critical decision points. <br />Schedule <br />It is our intent to select a design firm in the fall of 2004. Work would begin immediately <br />upon execution of contract documents. <br />Selection Criteria <br />Each proposal will be evaluated based on the following factors: <br />- RELEVANT EXPERIENCE: Depth of relevant experience of the overall design <br />team including landscape architects, engineers, and other pertinent professionals. <br />We aze especially interested in reviewing relevant experience including design of <br />trails, roads, or other facilities in difficult azeas such as steep slopes and <br />regulatory floodplains. <br />- QUALITY OF REFERENCES: Responders must submit names and contact <br />information for individuals able to provide references from at least three clients. <br />(Additional references aze encouraged). References must be for work similar in <br />nature to the proposed Bolin Creek Trail project, and must include at least one <br />reference from a staff member of a public body. <br />- QUALITY: Quality of projects completed by consultants will be assessed. <br />- TIMING: Ability of the Vendor to begin work immediately. <br />- PROPOSAL: Quality of the proposal document will be considered. <br />