Orange County NC Website
DCHC 2030 Long -Range Transportation Plan (LRTP) <br />Fixed Guideway Transportation Costs <br />Fixed Guideway Transportation Costs <br />Cost Estimates <br />2005 Dollars <br />Fixed Guideway Capital <br />TTA Rail -Phase 1 DCHC Portion <br />$349,050,700 <br />US 15501 fixed guideway Duke -UNC /Horace Williams <br />$299,299,830 <br />Total Fixed Guideway Capital <br />$648,350,530 <br />Fixed Guideway Operating & Maintenance (O &M <br />TTA Rail -Phase 1 DCHC Portion <br />$312,374,925 <br />US 15501 fixed guideway Duke -UNC /Horace Williams <br />$101,239,898 <br />Total Fixed Guideway O & M <br />$413,614,823 <br />Total Fixed Guideway Cost Estimates <br />$1,061,965,353 <br />High Capacity Transit <br />High Capacity Transit I40- carrboro plaza; eubanks - southem village) - Capital <br />$66,926,000 <br />High Capacity Transit I40- carrboro plaza; eubanks - southem village) - O & M <br />$35,331,642 <br />Total High Capacity Transit Cost Estimates <br />$102,257,642 <br />Rail Corridor Protection/Feasibility Studies <br />$13,575,623 <br />Preservation of existing rail ROW <br />Total Fixed Guideway/Rail Corridor Cost Estimates <br />$1317727 618 <br />33 <br />