Orange County NC Website
FUNTii ,11 '-f [ m m i T 5 <br />DCHC 2030 Long -Range Transportation Plan (LRTP) <br />COSTS <br />31 <br />COST ESTIMATES 2005 Dollars) <br />No. <br />Cost Components <br />2005 dollars <br />1 <br />Hi hwa <br />1.1 <br />Improvement <br />$2,485,861,250 <br />1.2 <br />Maintenance <br />$741,618,431 <br />Total Highway Program <br />$3,227,479,681 <br />2 <br />Public Transportation - Transit/Fixed Guideway/Rail <br />2.1 <br />Bus Transit Cost <br />$2,253,122,343 <br />2.2 <br />Transit High Capacity <br />$102,257,642 <br />2.3 <br />Fixed Guideway (New Starts) <br />$1,028,893,265 <br />2.4 <br />Rail ROW Corridor Protection <br />$13,575,623 <br />Total Public Transportation (Rail) <br />$3,397,848,873 <br />3 <br />Non Motorized Transportation <br />Bike Facilities <br />$108,982,015 <br />Sidewalks & Pedestrian Walkways <br />$20,383,000 <br />Total <br />$129,365,015 <br />4 <br />TDM <br />$49,785,750 <br />5 <br />ITS /TSM <br />$56,680,000 <br />TOTAL 2025 Transportation Plan <br />T $6,861,159,319 <br />31 <br />