Orange County NC Website
G° TTAC HMEHT 46 <br />Transportation <br />Conformity Tasks <br />*Federal Review of Final CDR and LRTP <br />4 (EPA/FTA/FHWA) 30 Days <br />*Clean" Review Letter (EPA) <br />* USDOT Conformity Determination <br />(FTA/FHWA) <br />*Process Complete <br />tt — 9 to 12 months <br />Transportation <br />Conformity Tasks <br />W dam£ <br />H <br />*Rural (Donut Area) Conformity <br />�9. <br />is described <br />J7 N <br />— Conformity process the same as <br />for MPO except for the following: <br />• STIP is the planning document for the rural area <br />• The NCDOT "rural spreadsheet" is the TDM for <br />K "m <br />the rural area. <br />• The NCDOT makes the conformity determination <br />. <br />• NCBOT adopts STEP <br />H <br />