Browse
Search
Agenda - 03-03-2011 - 8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 03-03-2011
>
Agenda - 03-03-2011 - 8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2011 2:17:05 PM
Creation date
2/25/2011 2:17:04 PM
Metadata
Fields
Template:
BOCC
Date
3/3/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 03-03-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: March 3, 2011 <br />Action Agenda <br />Item No. 8 - Q <br />SUBJECT: Buckhorn-Mebane Utilities Phase II/Land Use: Community Outreach <br />DEPARTMENT: Planning and Inspections <br />PUBLIC HEARING: (Y/N) No <br />ATTACHMENT(S): <br />1. Current Future Land Use Map Areas A, B, <br />C, T, only Mebane ETJ (METJ) <br />INFORMATION CONTACT: <br />Craig Benedict, Planning Director, 245-2592 <br />PURPOSE: To receive a report on upcoming community outreach in the Buckhorn-Mebane <br />Phase II Utilities area. <br />BACKGROUND: Orange County has been evaluating the land use growth potential of the 1- <br />85/1-40 interstate corridor since the early 1990's. In 1994 Orange County rezoned over 1,000 <br />acres from Rural Residential (R-1) to Economic Development (ED) with specialized design <br />standards (i.e. Design Manual). Further, its review of these areas in the Efland-Buckhorn- <br />Mebane Corridor through small area planning efforts have culminated in recommendations and <br />implementation actions between 2005 and 2010. <br />Specifically: <br />• Watershed Boundary amendments near Seven Mile Creek <br />• Water and Sewer Management Planning & Boundary Agreement (WASMPBA) <br />amendments near Hillsborough and Mebane <br />• Infrastructure Master Planning in the Buckhorn Economic Development Zones -January <br />2010 <br />• Funding for Utility Infrastructure Design in Buckhorn-Mebane Economic Development <br />areas in 2010-2011 budget <br />• Ongoing collaboration with the City of Mebane <br />Departments involved: <br />• Planning & Inspections <br />• Manager's Office <br />• Economic Development <br />All of the above actions have been preparing the economic development growth corridor for <br />change. In anticipation of this and acknowledging that these actions have been over an <br />extended period, staff will be pursuing public outreach to affected areas. Some areas have: <br />• ED land use and zoning, <br />
The URL can be used to link to this page
Your browser does not support the video tag.