Browse
Search
Agenda - 03-03-2011 - 4g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 03-03-2011
>
Agenda - 03-03-2011 - 4g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2011 12:48:01 PM
Creation date
2/25/2011 12:48:00 PM
Metadata
Fields
Template:
BOCC
Date
3/3/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4g
Document Relationships
Minutes 03-03-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
RES-2011-019 Resolution Accepting Terms of the State Revolving Fund Loan Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: March 3, 2011 <br />Action Agenda <br />Item No. 4 - a <br />SUBJECT: Central Efland/North Buckhorn Sewer Extension Project -State Revolving <br />F~ Intl I nan RPSnluti~n <br />DEPARTMENT: Planning, Financial Services PUBLIC HEARING: (YIN) C~ <br />ATTACHMENT(S): <br />1. Resolution Accepting the Terms of the <br />State Revolving Fund Loan Program <br />2. Maps of Project Areas <br />INFORMATION CONTACT: <br />Craig Benedict, Planning, 245-2592 <br />Kevin Lindley, Planning, 245-2583 <br />Clarence Grier, Financial Services, <br />245-2453 <br />Michael Talbert, Financial Services, <br />245-2153 <br />PURPOSE: To approve a Resolution regarding the Clean Water State Revolving Fund Loan <br />application. <br />BACKGROUND: For the past several years, Orange County has been designing and <br />permitting a sewer extension to the Efland sewer system to serve the eastern portion of the <br />Efland community. Concurrently, Orange County has been designing and permitting an <br />extension to the City of Mebane's sewer infrastructure to serve residents in the Northern <br />Buckhorn area. The Efland sewer extension is designed to install approximately 20,000 linear <br />feet of 8" gravity sewer line, a new 250 gallon per minute pump station and 2,640 linear feet of <br />6" force main to serve the remainder of the area originally conceived of as Phase I and to serve <br />the area conceived of as Phase Two of the Efland sewer system. A map of the area to be <br />served as part of this Efland sewer extension is provided at Attachment 2. The area to be <br />served by this extension is roughly bounded by McGowan Creek to the north, the railroad to the <br />south, Efland-Cedar Grove Road to the west and Lloyd Dairy Road to the east. The estimated <br />construction cost of the Efland sewer extension is approximately $4,100,000. <br />A map of the area to be served by the extension of the City of Mebane's sewer system into the <br />Northern Buckhorn community is also provided at Attachment 2. This extension consists of <br />approximately 5,400 linear feet of 8 gravity sewer line. The area to be served by this extension <br />is roughly described as the section of Industrial Drive between the General Electric plant and <br />Buckhorn Road, the portion of Buckhorn Road between Interstate 85/40 and the railroad, and a <br />portion of Washington Street east of Buckhorn Road. The estimated construction cost of the <br />Northern Buckhorn sewer extension is approximately $600,000. The total estimated <br />construction cost for these two projects is approximately $4,700,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.