Orange County NC Website
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: March 3, 2011 <br />Action Agenda <br />Item No. 4 - a <br />SUBJECT: Central Efland/North Buckhorn Sewer Extension Project -State Revolving <br />F~ Intl I nan RPSnluti~n <br />DEPARTMENT: Planning, Financial Services PUBLIC HEARING: (YIN) C~ <br />ATTACHMENT(S): <br />1. Resolution Accepting the Terms of the <br />State Revolving Fund Loan Program <br />2. Maps of Project Areas <br />INFORMATION CONTACT: <br />Craig Benedict, Planning, 245-2592 <br />Kevin Lindley, Planning, 245-2583 <br />Clarence Grier, Financial Services, <br />245-2453 <br />Michael Talbert, Financial Services, <br />245-2153 <br />PURPOSE: To approve a Resolution regarding the Clean Water State Revolving Fund Loan <br />application. <br />BACKGROUND: For the past several years, Orange County has been designing and <br />permitting a sewer extension to the Efland sewer system to serve the eastern portion of the <br />Efland community. Concurrently, Orange County has been designing and permitting an <br />extension to the City of Mebane's sewer infrastructure to serve residents in the Northern <br />Buckhorn area. The Efland sewer extension is designed to install approximately 20,000 linear <br />feet of 8" gravity sewer line, a new 250 gallon per minute pump station and 2,640 linear feet of <br />6" force main to serve the remainder of the area originally conceived of as Phase I and to serve <br />the area conceived of as Phase Two of the Efland sewer system. A map of the area to be <br />served as part of this Efland sewer extension is provided at Attachment 2. The area to be <br />served by this extension is roughly bounded by McGowan Creek to the north, the railroad to the <br />south, Efland-Cedar Grove Road to the west and Lloyd Dairy Road to the east. The estimated <br />construction cost of the Efland sewer extension is approximately $4,100,000. <br />A map of the area to be served by the extension of the City of Mebane's sewer system into the <br />Northern Buckhorn community is also provided at Attachment 2. This extension consists of <br />approximately 5,400 linear feet of 8 gravity sewer line. The area to be served by this extension <br />is roughly described as the section of Industrial Drive between the General Electric plant and <br />Buckhorn Road, the portion of Buckhorn Road between Interstate 85/40 and the railroad, and a <br />portion of Washington Street east of Buckhorn Road. The estimated construction cost of the <br />Northern Buckhorn sewer extension is approximately $600,000. The total estimated <br />construction cost for these two projects is approximately $4,700,000. <br />