Browse
Search
Agenda - 03-03-2011 - 4f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 03-03-2011
>
Agenda - 03-03-2011 - 4f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2011 12:41:17 PM
Creation date
2/25/2011 12:41:16 PM
Metadata
Fields
Template:
BOCC
Date
3/3/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4f
Document Relationships
2011-046 AMS - Coulter Jewell Thames, P.A. - Amendment for Engineering and Construction Administration Services -Twin Creeks Greenway $25,875
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2011
Minutes 03-03-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />ARRA Local Guidelines <br />Erosion Control <br />• Requirements <br />• Erosion & Sedimentation Control Report <br />(Attachment 3, Construction Manual, Erasion & Landscaping Division 16, pg 1-~ <br />Record keepingldocumentation <br />• Progress Schedule Chart <br />• Engineer's Weekly SutYUUary <br />• Annual EEO Review ' <br />(Attachment 4, Construction Manual, Records & Reporting, pg, R 211-216) <br />Supplemental Anreements~Chan~e Ordexs <br />• Determine purpose and~need <br />Must be within original project scope <br />• Contractor and Engineer negotiate fact and reasonable price <br />Pricing breakdown {documentation example attached) must be provided from Contractor to LPA <br />and forwarded to Resident Engineer with oversight <br />Documentation required describing work, location and justification (NCDOT example attached) <br />• FHWA concurrence required <br />• Prior to ANY work commencing, approval must be obtained. Verbal agreements wi#hout <br />approval may constitute ineligible charges <br />(Attachment 5, Construction Manual, Records & Reporting, pg. R-114123) <br />P. O. Box 14996 Greensboro, NC 274154996 Telephone No. (336) 334-3192 Fez No. (336) 334-3637 <br />
The URL can be used to link to this page
Your browser does not support the video tag.