Browse
Search
Agenda - 03-03-2011 - 4f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 03-03-2011
>
Agenda - 03-03-2011 - 4f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2011 12:41:17 PM
Creation date
2/25/2011 12:41:16 PM
Metadata
Fields
Template:
BOCC
Date
3/3/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4f
Document Relationships
2011-046 AMS - Coulter Jewell Thames, P.A. - Amendment for Engineering and Construction Administration Services -Twin Creeks Greenway $25,875
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2011
Minutes 03-03-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />design review delays required the bridge fabrication release of approximately 169 calendar <br />days, impacting the general construction schedule and delaying the project's completion. <br />ARRA requires that NCDOT administer fund reimbursements for all of its awarded projects. <br />NCDOT is administering these projects in accordance with its standard published Construction <br />guidelines. In accordance with these guidelines, NCDOT requires that all projects be staffed by <br />a Resident Project Representative that must be present during all of the construction activities <br />for inspections, reporting and engineering supervision of the project. The NCDOT ARRA <br />Project Requirements-Local Municipal Requirements Memorandum dated February 8, 2010 <br />(Attachment C) states that Contract Administrator inspections "must be performed whenever <br />Contractor is working at all times". This level of on-site supervision is not customary with <br />County projects, but is required in this instance to receive the ARRA reimbursement funds. <br />Staff will continue to inspect the work and related charges invoiced by CJT through the <br />completion of the project. It has been noted that this level of CA oversight and the associated <br />additional cost to taxpayers may be excessive ("i.e. a concrete greenway trail built according to <br />the same oversight as a Federally funded highway project). However, it is required as part of <br />the ARRA funds' administrative requirements. <br />FINANCIAL IMPACT: The additional amount for these services is not to exceed $25,875, and <br />will be paid for out of the budgeted contingency funds within the Capital Project. ARRA funds <br />will reimburse the County up to $429,457 of the contracted $498,992.40 General Construction <br />Contract with McQueen Construction, provided that the County follow the NCDOT project <br />administration requirements. Should the Board not approve this amendment for <br />required services, the County may not be eligible for reimbursement up to the $429,457 <br />amount since it would be in violation of the NCDOT project administration guidelines. <br />RECOMMENDATION(S): The Manager recommends the Board authorize the Manager to sign <br />the Contract Amendment not to exceed $25,875 for Contract Administration Services with <br />Coulter, Jewell, Thames, PA for the Twin Creeks Greenway Project as required by NCDOT as <br />Contract Administrator for American Recovery and Reinvestment Act ("ARRA") funds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.