Browse
Search
RES-2004-063 Phase One DAVI-NET - Preliminary Plan Resolution
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2000-2009
>
2004
>
RES-2004-063 Phase One DAVI-NET - Preliminary Plan Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2011 9:58:28 AM
Creation date
2/22/2011 12:51:04 PM
Metadata
Fields
Template:
BOCC
Date
8/17/2004
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
9c
Document Relationships
Agenda - 08-17-2004-9c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2004\Agenda - 08-17-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~'S - Boa y- o ~ 3 <br />RESOLUTION ~ ~ / 7 .- ao v ~ <br />OF THE ~ G <br />ORANGE COUNTY BOARD OF COUNTY COMI~~IISSIONERS <br />Date At,o,cr ~~, ~.fln4 <br />Name of Subdivision PhacP [)nP WAVY-NF.T <br />Owner/Applicant ('.rahtrPP RanP, T.T.C: <br />The Board of County Commissioners hereby approves Phase One DAVI-NET subdivision <br />preliminary plat, dated Apri12, 2004 and last revised July 30, 2004 containing 10 lots, subject <br />to the fulfillment of requirements specified herein. <br />Egg Lane and Suze Drive shall be irrevocably dedicated to the general public and be <br />constructed to standards of the North Carolina Department of Transportation. The approval of <br />this resolution authorizes and directs the Orange County Manager to accept for Orange County <br />and on behalf of the public generally, the offer of dedication of Egg Lane and Suze Drive. <br />This acceptance by Orange County of the dedication to the general public of Egg Lane and <br />Suze Drive shall be without maintenance responsibility. These roads shall be maintained by <br />the owner/applicant until such time as they are accepted for maintenance by the North Carolina <br />Department of Transportation or some other governmental body. Before the Final Plat of <br />Phase One DAVI-NET can be recorded: <br />A. Sewage Disposal <br />Each residential lot shall contain an adequate area for septic disposal, and repair <br />area, approved by the Orange County Division of Environmental Health. <br />2. The septic system location may restrict the size and location of improvements. <br />This disclosure shall be included in a document describing development <br />restrictions to be recorded concurrently with the Final Plat. The document shall <br />also disclose that information regarding the tentative location of septic systems <br />is available from the Orange County Health Department, Division of <br />Environmental Health. <br />B. Roads and Access <br />Egg Lane, including a stubout area at the southern boundary of the subdivision <br />property, and Suze Drive shall be constructed to standards of the North Carolina <br />Department of Transportation; within a 50 foot right-of-way with 5 foot utility <br />easements on each side, and the construction shall be inspected and approved by <br />NCDOT. The pavement width for Suze Drive shall be a minimum of 18 feet and <br />the pavement width for Egg Lane shall be a minimum of 20 feet. <br />OR <br />
The URL can be used to link to this page
Your browser does not support the video tag.