Browse
Search
2004 S Purchasing- Southern Orange Senior Center Architect Gurlitz Architects
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2004
>
2004 S Purchasing- Southern Orange Senior Center Architect Gurlitz Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2011 2:21:38 PM
Creation date
2/22/2011 12:45:43 PM
Metadata
Fields
Template:
BOCC
Date
8/17/2004
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
9b
Document Relationships
Agenda - 08-17-2004-9b
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2004\Agenda - 08-17-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.6.6.1 The Architect shall conduct inspections to determine the date or dates of <br />Substantial Completion and the date of fmal completion, shall receive from the Contractor <br />and forward to the Owner, for the Owner's review and records, written warranties and <br />related documents required by the Contract Documents and assembled by the Contractor, <br />and shall issue a fmal Certificate for Payment based upon a fmal inspection indicating the <br />Work complies with the requirements of the Contract Documents. <br />2.6.6.2 The Architect's inspection shall be conducted with the Owner's Designated <br />Representative to check conformance of the Work with the requirements of the Contract <br />Documents and to verify the accuracy and completeness of the list submitted by the <br />Contractor of Work to be completed or corrected. <br />2.6.6.3 When the Work is found to be substantially complete, the Architect shall inform <br />the Owner about the balance of the Contract Sum remaining to be paid the Contractor, <br />including any amounts needed to pay for fmal completion or correction of the Work. <br />2.6.6.4 The Architect shall receive from the Contractor and forward to the Owner: (1) <br />consent of surety or sureties, if any, to reduction in or partial release of retainage or the <br />making of fmal payment and (2) affidavits, receipts, releases and waivers of liens or bonds <br />indemnifying the Owner against liens. <br />ARTICLE 2.7 FACILITY OPERATION SERVICES <br />2.7.1 The Architect shall meet with the Owner or the Owner's Designated <br />Representative promptly after Substantial Completion to review the need for facility <br />operation services. <br />2.7.2 Upon request of the Owner, and prior to the expiration of one year from the date <br />of Substantial Completion, the Architect shall conduct a meeting with the Owner and the <br />Owner's Designated Representative to review the facility operations and performance and <br />to make appropriate recommendations to the Owner. <br />ARTICLE 2.8 SCHEDULE OF SERVICES <br />2.8.1 Design and Contract Administration Services beyond the following limits shall <br />be provided by the Architect as a Change in Services in accordance with Paragraph 1.3.3: <br />.1 up to two (2) reviews of each Shop Drawing, Product Data item, sample <br />and similar submittal of the Contractor. <br />.2 up to forty eight (48) visits to the site by the Architect over the duration of <br />the Project "during construction. <br />.3 up to two (2) inspections for any portion of the Work to determine whether <br />such portion of the Work is substantially complete in accordance with the <br />requirements of the Contract Documents. <br />.4 up to two (2) inspections for any portion of the Work to determine final <br />completion. <br />.5 Architect will include language in construction documents that requires <br />costs associated with Change in Services in this paragraph 2.8.1 to be the <br />responsibility of the Contractor. <br />.6 Architect will advise Owner of the need for inspections/reviews that exceed <br />allotment, and must receive Owner's authorisation for such <br />inspections/reviews prior to providing service. <br />2.8.2 The following Design and Contract Administration Services shall be provided by <br />the Architect as a Change in Services in accordance with Paragraph 1.3.3: <br />.1 review of a Contractor's submittal out of sequence from the submittal <br />schedule agreed to by the Architect; <br />~ 1917, 1926, 1948, 1951, 1953, 1958, 1961, 1963, 1966, 1967, 1970, 1974, 1977, 1987, ®1997 by the American <br />Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written <br />permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. <br />WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. <br />This document was electronically produced with permission of the AIA and can be reproduced in accordance with your <br />license without violation until the date of expiration as noted below. User Document 97b141.aia -- 6/18/2002. AIA <br />License Number 1111656. <br />This document has Important legal <br />consequences. Consultation with an <br />attorney Is encouraged with respect <br />to its comp/eGon or modification. <br />AUTHENTICATION OF THIS <br />ELECTRONICALLY DRAFTED AIA <br />DOCUMENT MAY BE MADE BY <br />USING AIA DOCUMENT D401. <br />~w~~~, ,; <br />~att~ .! <br />.® <br />mtasr an <br />AlA DOCUMENT 8141-1997 <br />STANDARD FORM AGREEMENT <br />The American Institute of Architects <br />1735 New York Avenue, N.W. <br />Washington, D.C. 20006-5292 <br />
The URL can be used to link to this page
Your browser does not support the video tag.