Orange County NC Website
Site Plan Sperm cations (Continued): <br />Berms, retaining walls, tree wels, or rip rap as part of the grading plan <br />Phase Ines and numbers tf the development is to be phased <br />Staging area for storage of construction materials, equipment, and vetbdes <br />Temporary constructer traDer/office if proposed <br />NOTE: Additional information may be mgWmd based on the site location and the type of use <br />proposed. <br />I, the applicant, hereby certify that the foregoing application 13 complete and accurate. <br />A *.mt's signature Owner's signature <br />.Date Date <br />