Orange County NC Website
B. Preliminary staff review /Distribution to review agencies <br />During the first 7 days after an application is accepted, the Planning Staff will conduct its preliminary <br />review and distribute the application materials to review 'agencies, including but not limited to, those <br />listed below: . <br />County Engineer. Reviews plans for providing water and sewer, and design of structural stormwater <br />controls. <br />Coaaty`Attorney: Reviews and approves legal documents and agreements. <br />Erosion Control'DW131m: Reviews and approves gracing plans, erosion control plans, and design of <br />structural stormwater. controls. <br />Inspections Division: Reviews and approves bong plans consistent with the Math Cvoka <br />Building Code. <br />Public Works: Reviews plans to assure adequate provision for soled waste disposal. <br />Emergency Semi=: Reviews site plan to assure adequate access and rraneuverabft for <br />emergency vets <br />Sberrft's Department: Reviews proposal to assure adequacy of Sheriff's Department personnel. <br />NC Dept; of Transportation: Reviews plans to determine adequacy of proposed public road r <br />improvements. <br />Applicable rim District: Reviews plans to am.we for adequate access and mumverability.of fire <br />Vehicles and adequacy of water supply for fire - fighting. <br />Applicable WRY Providers: Provide assurance, though a written agreement, that utility service <br />can and will be provided to the proposed development. <br />C. Agency Review <br />RevieW agencies win have 14 days to coffamt on the proposal: Comments will. be submitted in <br />writing to the. Planning Staff <br />D. Compile agency comments and prepare Preliminary Report <br />Following the 14-day agency review period 13'a 7-day period during which Planning Staff will compile` <br />comments and prepare a Pre!ar roy - Report: The report will be *distributed to the review agencies <br />-and to the applicant prior to the Development Review Meeting. I <br />T. Development Review'Meeting <br />The Development Review Meeting will take place on the scheduled date at 3.00 P.M. in Conference <br />Room #1 of the Planning and agrki turai Building. WI review agencies as well as the applicant are . <br />