Browse
Search
2004 S Purchasing- Contract with Corley Redfoot Zack (CRZ) for Design Services for West Ten Soccer Park
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2004
>
2004 S Purchasing- Contract with Corley Redfoot Zack (CRZ) for Design Services for West Ten Soccer Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2013 4:14:37 PM
Creation date
2/22/2011 12:37:54 PM
Metadata
Fields
Template:
BOCC
Date
5/18/2004
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
9c
Document Relationships
Agenda - 05-18-2004-9c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2004\Agenda - 05-18-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.2.2 Where compensation is based on a stipulated sum or percentage of Construction Cost, <br />progress payments for Basic Services in each phase shall total the following percentages of the <br />total Basic Compensation payable: <br />$ 80/hour <br />Figineer's Time: <br />(Insert additional phases as appropriate.) <br />CAM/Drafting: <br />$ 60/hour <br />Master Planning: <br />$ 70/hour <br />$ 25,200 <br />Schematic Design Phase: <br />rFent4__4} <br />142070 <br />Design Development Phase: <br />pet" -( —4b - <br />182760 <br />Construction Documents Phase: <br />32,830 <br />Bidding or Negotiation Phase: <br />42690 <br />Construction Phase: <br />Prt - -Ar7- <br />23,450 <br />Total Basic Compensation: <br />one hundred percent (loo %) $1199000 <br />11.3 COMPENSATION FOR ADDITIONAL SERVICES <br />11.3.1 For Project Representation Beyond Basic Services, as described in Paragraph 3.2, compen- <br />sation shall be computed as follows: <br />Principal's Time: <br />$110/hour <br />Architect's Time: <br />$ 80/hour <br />Figineer's Time: <br />$ 95/hour <br />CAM/Drafting: <br />$ 60/hour <br />Construction Admin.: <br />$ 70/hour <br />Other employees at a rate of 2.75 <br />times the direct hourly wage. <br />11.3.2 For Additional Services of the Architect, as described in Articles 3 and 12, other than <br />(1) Additional Project Representation, as described in Paragraph 3.2, and (2) services included in <br />Article 12 as part of Basic Services, but excluding services of consultants, compensation shall be <br />computed as follows: <br />(Insert basis of compensation, including rates and multiples of Direct Personnel Expense for Principals and <br />employees, and identify Principals and classify employees, if required. Identify specific services to which <br />particular methods of compensation apply, if necessary.) <br />Same as 11.3.1 above. <br />16 <br />WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. <br />®1997 AIA® <br />AIA DOCUMENT B151 -1997 <br />ABBREVIATED OWNER - <br />ARCHITECT AGREEMENT <br />The American Institute <br />of Architects <br />1735 New York Avenue, N.W. <br />Washington, D.C. 20006 -5292 <br />
The URL can be used to link to this page
Your browser does not support the video tag.