Browse
Search
2004 S Purchasing - Corley Redfoot Zack Inc & Orange County for Parks Operation Base & Storage Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2004
>
2004 S Purchasing - Corley Redfoot Zack Inc & Orange County for Parks Operation Base & Storage Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2013 4:30:49 PM
Creation date
2/22/2011 11:57:39 AM
Metadata
Fields
Template:
BOCC
Date
8/17/2004
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
9a
Document Relationships
Agenda - 08-17-2004-9a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2004\Agenda - 08-17-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Pamela K. Jones <br />RE: Orange County Parks <br />BASIC SERVICES: <br />August 10, 2004 <br />page 2 <br />The fee for Basic Services, including the Town of Hillsborough approval process, is $45,000. <br />Basic Services consist of the following: <br />Architectural design <br />Civil Engineering design <br />Structural Engineering design <br />HVAC /Electrical /Plumbing design <br />Construction Administration (Basic Services provides one visit per week to the project during the <br />construction period. Additional site visits are considered Additional Services.) <br />Corley Redfoot Zack, Inc., is pleased to provide design services for your project. The work will be <br />produced as outlined below. The consultants listed have worked with us on similar projects, and <br />our strong working relationship will benefit your project. <br />Corley Redfoot Zack, Inc.: Civil Engineering and Architecture <br />Reece, Noland & McElrath, Inc.: Mechanical /Electrical /Plumbing Engineering <br />Lasater•HopkinsChang, PC: Structural Engineering <br />PROJECT BUDGET SUMMARY: <br />The Designer's understanding of the overall budget for the project is as follow: <br />Construction: Building and Sitework W <br />Contingency: 16,000 <br />Hillsborough Water /Sewer Fees: _2D AAA' <br />Professional Design Service Fees: 45,000 <br />Testing, Miscellaneous Fees and Permits: 9,000 <br />Total Project Budget: $675,000 <br />�' ✓�'� Ova �'�/2 • $� /� /Z�� �" <br />The proposed schedule indicates that occupancy should be no later than July 31, 2005. Based on <br />information gathered to -date, this schedule is "do- able ". Please note that the Designer's ability to <br />adhere to this schedule is predicated upon timely receipt of reviews and approvals from the Owner, <br />authorized agencies of the Owner, and local and state agencies having jurisdiction over the project. <br />SERVICES NOT INCLUDED: <br />- Legal fees <br />- Geotechnical investigation <br />- Town permitting or approval process fees <br />- Renderings or models <br />CORLEY REDFOOT ZACK wc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.