Orange County NC Website
SPECIFICATIONS <br />PROJECT SPECIFICATIONS <br />Project: REPLACING THE BOILER, RECREATION PUMP AND COMPETITION PUMP <br />Building/Facility: Sportsplex <br />Location: 101 Meadowlands Drive, Hillsborou h, NC 27278 <br />Orange County requires bids to replace the boiler, recreation pool pump and competition pool pump. In order to minimize <br />downtime and mod'rfications only bids submitted using exact match to existing equipment will be cosidered. Please include a list <br />deliverables as well as unit prices with your bid. <br />The project shall consist of all work spec'rfied in the following table. The spec'rfications below are intended to describe Orange <br />County's needs. Slight deviations may be accepted with advance approval by Orange County Purchasing. Please use the space <br />provided in the 'VARIANCE" column to identify any proposed variances to the spec'rfications. This projectwill be managed bythe <br />Orange County Purchasing and Public Works Departments. <br />All work shall comply with all applicable national, state and local building codes. Contractor shall be responsible for securing <br />required permits. <br />Successful Contractor Shall be responsible for the Following <br /># DESCRIPTION YES NO VARIANCE <br /> Boiler Re lacement Sco e <br />1 Remove/Replace with new Recpac Rec Pool Heater with same <br />model (P-0514) and ca acit as existin . <br />2 Furnish and install fuel disconnect valve (1 1/a") at accessible hei ht <br />3 Start-u /commission <br /> Pool Pum s Re lacement Sco e <br />4 Isolate Recreation pool pump and replace complete assembly <br />(including motor) with same make/model as existing (Marlow # 3- <br />9 530SC, 10 HP ODP Motor <br />5 Start-u /commission <br />6 Return old um assembl to customer <br />7 Isolate Competition pool pump and replace complete assembly <br />(including motor) with same make/model as existing (Marlow # 5- <br />9 530SC, 15 HP ODP Motor <br />8 Start-u /commission <br />9 Return old um assembl to customer <br />10 The pumps will be replaced one at a time to ensure one pool is <br />open at all times.. The boiler must be completed in one day <br />Orange County Shall be responsible for the Following <br /># DESCRIPTION YES NO VARIANCE <br />1 Access to worksite <br />