Orange County NC Website
50 <br />Article 2: Procedures <br />Section 2.9: Conditional Districts <br />(2) The Board of County Commissioners, in reviewing a CUD application, <br />may impose such reasonable conditions upon approval of a CUD <br />request as will afford protection of the public= health, safety, and general <br />welfare, ensure that substantial justice is done, and ensure equitable <br />treatment. <br />(3) Only those conditions mutually agreed to by the applicant and the Boar(] <br />of County Commissioners may be imposed on a CUD application. <br />(4) Within the Economic Development Districts (EDDs), there are specific <br />uses that require approval of a CUD. These uses are noted on the Table <br />Of Permitted Uses - Economic Development Districts (Section 5.2) <br />(B) Applications <br />Applications to establish a CUD shall be submitted to the Planning Director and <br />shall be processed in accordance with the procedure(s) for: <br />(1) Zoning Atlas amendment (Section 2.8), <br />(2) Class A Special Use Permit (Section 2.7), and <br />(3) The provisions of this Section. <br />(C) Submittal Requirements <br />(1) In addition to the CUD application form, an applicant shall also submit <br />the following information: <br />(a) A plan prepared in accordance <br />with the provisions of Section 2.5 including the following: <br />A detailed description of the proposed use of property <br />including an outline of the proposed operational <br />characteristics of the proposed development, <br />(ii) A detailed traffic survey, regardless of the estimated <br />number of trips per day, prepared in accordance with all <br />applicable North Carolina Department of Transportation <br />(NC DOT) requirements or standards as well as Section <br />6.17 of this Ordinance, and <br />(iii) The appropriate environmental document prepared in <br />accordance with Section 6.16. <br />(iv) A landscape plan showing the location of on -site <br />significant trees; proposed screening, buffers, and <br />landscaping; and any proposed treatment of any existing <br />natural features. <br />(b) A summary of utility services, including processing of <br />wastewater. <br />Orange County, North Carolina — DRAFT Unified Development Ordinance Page 2 -39 <br />