Orange County NC Website
38 <br />• Figure 6.6.2.A.3: Shared Access, shown below, to replace graphic in UDO <br />Public Hearing Draft <br />• Page 6 -51 <br />Hwy 70 <br />Shared <br />Driveway <br />Service Street _ Cut <br />® s � <br />Non- residential Developments Within Pre - defined Commercial Areas of Highway 70 <br />Figure 6.6.2.A.3: Shared Access <br />• Figure 6.7.2.A: Permitted Utility Adjustments, shown below, to replace graphic <br />in UDO Public Hearing Draft <br />• Page 6 -59 <br />Figure 6.7.2.A: MPD -CZ Permitted Utility Adjustments <br />Example <br />Plan <br />A <br />-J_ <br />a NJ n 13 �a <br />Shift < 50' QLa <br />r. <br />p p Approved Utility Approved Stormwater Pond <br />Permitted Utility Adjustment Revised Stormwater Pond <br />- -- <br />Required Setback (Not Adjustable) <br />