Browse
Search
Agenda - 02-28-2011 - C.1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 02-28-2011
>
Agenda - 02-28-2011 - C.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 10:48:23 AM
Creation date
2/21/2011 10:29:39 AM
Metadata
Fields
Template:
BOCC
Date
2/28/2011
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C.1
Document Relationships
Minutes 02-28-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Staff Notes of Board of County Commissioners Comments -- First Draft UDO, Aug. 11, 2010 <br />Coding Defined: <br />— Consistent with project scope and addressed through changes reflected in public hearing draft UDO. <br />", For further BOCC discussion — Consistent with project scope but requires further BOCC discussion and direction to staff <br />ensure revisions are proposed that are likely to be accepted by the Board. <br />"T', Implementation Bridge /Possible future phases — Beyond project scope and to be prioritized for potential future UDO <br />amendment phases. These items are all documented as part of public hearing materials and will be forwarded to the <br />County's consultant for consideration in their final "implementation Bridge" report that is to include recommendations on <br />future UDO amendment phases. <br />"4 ", Suggesting no action — Staff is recommending no action at this time because of the complex interrelationships among <br />UDO sections and to avoid any internal inconsistencies that could be created if not addressed in a thorough and compreh <br />1) Incorporated; 2) For further BOCC discussion; 3) Implementation Bridge — Possible future phases; 4) Suggesting no action 90/8/2010 n� <br />W <br />cn <br />
The URL can be used to link to this page
Your browser does not support the video tag.