Browse
Search
Agenda - 02-28-2011 - C.1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 02-28-2011
>
Agenda - 02-28-2011 - C.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 10:48:23 AM
Creation date
2/21/2011 10:29:39 AM
Metadata
Fields
Template:
BOCC
Date
2/28/2011
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C.1
Document Relationships
Minutes 02-28-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
145 <br />Table of Permitted Uses, Sec. 5.2, beginning on p. 5 -6 <br />Additional Standards for MPD -CZD, Sec. 6.7. pp_ 6 -54 through 6 -63 <br />Cluster Developments, Application Criteria for the Rural Buffer Zoning <br />District, Sec. 7.12, pp. 7 -48 and 7 -49 <br />C. OTHER COMMENTS <br />Here are other sections that need review. Note that there is some overlap with sections <br />described above. <br />Review all sections shown in green type. Also, all sections that are new, and not simply <br />related to consolidation of the county's ordinances, should be reviewed. <br />Review all sections and definitions related to Site Plan, Site Specific Development Plan, <br />and Plot Plan. (For example, look at Sec. 2.4.1, 2.4.2, 2.4.3, pp. 2 -10 through 2 -12). <br />Also note that there is no definition of "Plot Plan" in Article 10. <br />Review the changes related to Special Use Permits. For example, look at Sec. 2.7, <br />starting on p. 2 -24. <br />Review the requirements for public hearings. For example, Sec. 2.8.6, p. 3 -36 deletes <br />the dates for the quarterly public hearings (February, May, August, November). These <br />dates were specified so the public would be able to keep track of when these important <br />hearings were to be held. <br />Clarify where "institutional uses" and "professional services" can be found in the Table <br />of Permitted Uses. It appears that there are no categories (e.g. "commercial uses ") <br />corresponding to these uses. <br />Review the significance of the requirements and changes related to "wastewater <br />treatment facility." For example, see page 3 -3, bullet 6. Also note that in this bullet <br />"Conditional Use (CU) District" is not in red type, even though these words are new. <br />Review the significance of the requirements related to "minimum usable area for lots <br />that utilize ground absorption wastewater systems." For example, see page 3 -7, bullet <br />5. <br />There are surely other sections that need further review, but these are the ones I have <br />identified so far. <br />AMG 11/22/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.