Browse
Search
Agenda - 02-22-2011 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 02-22-2011
>
Agenda - 02-22-2011 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2011 8:51:58 AM
Creation date
2/21/2011 8:51:54 AM
Metadata
Fields
Template:
BOCC
Date
2/22/2011
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes 02-22-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• • <br />SWCC 7 YEAR BUDGET PROJECTION -BOARD OF ORANGE COUNTY COMMISSIONERS WORK SESSION PAGE 3 <br />LINE ITEM NOTES FOR TARGETED EXPENSES: <br />#1 SWCC Improvements -As shown, Walnut Grove upgrade is constructed in FY 2011/12 and the upgraded site open in 2012/13, High Rock upgrade constructed in FY <br />2012/13 and opened in 2013/14, Eubanks upgrade constructed in FY 2013/14 and opened in 2014/15, Ferguson upgrade constructed in 2014/15 and opened in 2015/16 and <br />Bradshaw Quarry upgrade constructed in FY 2015/16 and opened in FY 2016/17. The landfill is assumed to close in 2016. <br />#2 SWCC Compactors and Equipment is the capital proposed for all hardware at each site as it is upgraded. These are the currently agreed to budget amounts for each site <br />with contingency and egineering for the comapctors and related hardware. These capital costs are inflated at three percent per year. Part of these costs will be covered by <br />the 3-R fee for those compactors associated with recycling operations. <br />#3 SWCC Construction Costs is all remaining capital expenditures proposed for each site as it it upgraded. These are the currently agreed to budget amounts for each site <br />(with contingency and engineering) for all remaining improvements at each site. These capital costs are inflated @ 3% to the year of actual construction. <br />#4 Personnel costs build from baseline direct costs in FY 2011-12 and are not escalated. <br />#5 Operating costs build from the baseline direct costs in FY 2010 then increased at 3% per year. <br />#6 Environmental Support costs are prorated among Landfill Division, Recycling Division and Sanitation Division and are not escalated. <br />#7 Cost Increase due to increased tons -increasing at 5% per year across all sites with costs associated with increased hauling only -see "Updated BP Summary Savings <br />Worksheet" for details. <br />f#8 SWCC Business as Usual will experience cost increases when the Durham Transfer Station has to be used beginning in 2016/2017. Staff calculated these costs at <br />$140,000 in 2010 dollars, escalated to the year 2016/17 and beyond at 3% per year. <br />#9 Existing rolling stock replacement not currently included in Enterprise fund equipment replacement reserves. <br />#10 SWCC Business as Usual costs -showing the total annual expenses projected if no efficiency improvements are made to the SWCCs. <br />#11 Cost forAdded Hours -Cost increase for added hours phased in as Walnut Grove expands hours in 2012/13 (going to 5.5 days incl Sunday 4 hours + Thursday 11 hrs, <br />High Rock in 2013/14 (open 4 days per week), Eubanks in 2014/15 expanding hours (going to 5.5 days incl Sunday 4 hours + Thursday 11 hrs), and finally adding Ferguson <br />in 2015/16 (open 4 days per week). <br />#12 Cost savings due to increased efficiencies from compacting/fewer. hauls, phased in as sites are improved, with savings documented when upgraded site opens -see <br />"Updated Summary Savings Worksheet' for details. Note that these cost savings include net savings from hauling projected increased tons more efficiently than they are <br />currently hauled in business as usual <br />#13 -Total adjustments to operating costs with increased hours adding operating costs and efficiency improvements eliminating operating costs <br />#14 SWCC Debt for Capital Improvements -Hardware is assumed to be the annualized amortization of capital for the Neighborhood/District SWCC System broken out by the <br />recycling related improvements hardware -financed over 8 years @ 4% (Calculated based on the capital cost of the hardware for each facility improvement being added to <br />the debt payment formula at the time that those funds are borrowed) <br />#15 SWCC Debt for Capital Improvements -Non-Hardware is assumed to be the annualized amortization of capital for the Neighborhood/District SWCC System for the <br />balance of all remaining improvements -financed over 15 years @ 4% (Calculated based on the capital cost of the remaining upgrades for each facility improvement being <br />added to the debt payment formula at the time that those funds are borrowed) <br />#16 Total SWCC Targeted Expenses -this is the total for annual expenses at the SWCCs with all upgrades completed and' financed, added open hours and cost savings from <br />efficiency improvements. <br />February 5, 2011 DRAFT <br />N <br />~A <br />
The URL can be used to link to this page
Your browser does not support the video tag.